This is a test of GDPR / Cookie Acceptance [about our cookies]
Really irritating test - cookie expires in 24 hour!
Great Western Coffee Shop
Recent Public Posts - [guest]
Re: Thames Valley infrastructure problems causing disruption elsewhere - 2026
In "Across the West" [378531/31163/26]
Posted by Trowres at 21:46, 21st August 2026
 
Page 53 in the 2004 report mentioned upthread  is the following:

Ensuring we have the right numbers of signalling staff is essential to run a good railway.
Historically we have had gaps in this space, but have made improvements, which we plan to build on in the next 12 months. By year end, we will have sustained the improvement in recruitment numbers to frontline signaller roles so that we have the right number of people
to signal the railway and help with providing ongoing development for signallers in the Region. In Wales & Borders, we have reduced our vacancy gap to circa 4% (down from 12% 24 months previous). We plan to recruit 22 signallers by year end (March 2025) which will
add further resilience to the signaller establishment. In Western Route, the vacancy gap is at 8.8%. However, there is a change being completed in the system due to a re-org of relief roles, once complete the true vacancy gap is 5.9% (down from 7.1% 24 months previous).
We have 8 new starters in the next 3 months and forecasted to recruit a further 19 signallers by year end (March 2025) and are currently reviewing age profile data to keep this under review as part of our engagement of a strategic workforce planning consultant. Alongside
this, we are operating a candidate pooling process such that we identify suitable external candidates ready for any vacancies at TVSC and are looking at expanding this across the Route; thus, speeding up the recruitment process.

The report continues with more on the training theme and how software will be used to aid signallers in recovering from disruption. As automatic route-setting is a feature of TVSC in normal use, the gist of the section on recovering from disruption is that the software can b e used to rapidly rearrange the routeing of trains to allow ARS to continue, allowing signallers to concentrate on whatever else is needed.

It's strange that signaller shortages have received much lower prominence than shortage of train crew, but the above seems to be an admission that NR lost sight of managing staffing levels and turnover. Too many reorganisations, perhaps?

Re: Melksham to Bristol Parkway - no fare, mis-advertised, mis-sold, not corrected
In "Fare's Fair" [378530/32392/4]
Posted by ChrisB at 21:31, 21st August 2026
 
Which route is shorter?

Re: NPPF revisions - more homes can be built near stations?
In "Looking forward - the next 2, 5, 10 and 20 years" [378529/32385/40]
Posted by ChrisB at 21:26, 21st August 2026
 
rubber stamping I reckon

Re: NPPF revisions - more homes can be built near stations?
In "Looking forward - the next 2, 5, 10 and 20 years" [378528/32385/40]
Posted by Trowres at 21:12, 21st August 2026
 
Houses without requiring planning consent

They'd still need planning consent in consideration of other issues, would they not, as the following extract from NPPF says:

These should be approved, unless the benefits of doing so would be substantially outweighed by any adverse effects, when assessed against the national decision-making policies in this Framework


The NPPF is, I think, trying to say: "Developments outside settlement boundaries are usually a bad thing, but if there's a useful railway station nearby, we can say that the development is actually OK".
What I'm having trouble in deciding is whether or not the "Top 80 GVA" rule is actually doing anything useful.

Re: Wilts & Berks Canal - merged posts, ongoing developments and discussion
In "Heritage railways, Railtours, buses, canals, steamships and other public transport based attractions" [378527/28863/47]
Posted by Mark A at 20:26, 21st August 2026
 
**J. F. Pownall has entered the chat**

Re: NPPF revisions - more homes can be built near stations?
In "Looking forward - the next 2, 5, 10 and 20 years" [378526/32385/40]
Posted by ChrisB at 20:12, 21st August 2026
 
Houses without requiring planning consent

Re: Melksham to Bristol Parkway - no fare, mis-advertised, mis-sold, not corrected
In "Fare's Fair" [378525/32392/4]
Posted by grahame at 19:43, 21st August 2026
Already liked by Chris from Nailsea
 
In my personal view, it is e) five times unfortunate that an apparently inexperienced rail traveller on that particular route would prefer to initially follow Google rather than the free guidance offered by an extremely knowledgeable local human being.

Thank you, but at the early point in events, he had no way of evaluating my knowledge. If we had had Information at the Station available on hand to answer questions - and to point people as appropriate to correct official information to help them.

Re: Melksham to Bristol Parkway - no fare, mis-advertised, mis-sold, not corrected
In "Fare's Fair" [378524/32392/4]
Posted by Chris from Nailsea at 19:11, 21st August 2026
 
In my personal view, it is e) five times unfortunate that an apparently inexperienced rail traveller on that particular route would prefer to initially follow Google rather than the free guidance offered by an extremely knowledgeable local human being.


(I know grahame is a human being because none of his typos are corrected by AI.  I tidy up some of them for him.) 

Chris from Nailsea. 

Melksham to Bristol Parkway - no fare, mis-advertised, mis-sold, not corrected
In "Fare's Fair" [378523/32392/4]
Posted by grahame at 18:45, 21st August 2026
Already liked by Mark A
 
Yesterday, I caught the bus to Blenheim house, walked back over the bridge and double back down to Melksham station to catch the train.  Another gent was doing the same - went to the ticket machine and looked to be in "learning mode". I asked if I could help, and he told me he was looking to travel to Bristol Parkway.   Next trains coming at 12:33, and I advised he catch that he would need to change at Chippenham and Bristol Temple Meads. 

I was advised I was wrong - according to Google, it's a single change at Swindon and, hey, what would I kow as a randon traveller?  My "yes ... but ..." starter was brushed aside and he bought his ticket.  But then he looked at it after it came out of the machine ... "But this says 'only valid via Bath Spa'" he said.  "It didn't tell me that in the screen as I bought it ...".  Correct - it didn't.

Via Bath Spa ... 12:33, change at Chippenham (12:44 to 13:13), change at Temple Meads (13:39 to 14:00) and arrive 14:09 at Bristol Parkway. Valid.

Via Swindon ... 12:33, change at Swindon (13:01 to 13:10) and arrive Bristol Parkway 13:31. But not valid on the ticket issued by the ticket machine, and no indication prior to purchase.

My friend asked what he could to - I suggested that he ask the train manager to "excess" him, as he was on a timescale and could not really afford over half an hour more as he travelled; I told him there wasn't a Melksham to Bristol Parkway ticket valid via Swindon, even though it's usually very much the faster way, though a ticket to beyond Bristol Parkway into South Wales *would* be valid that way.   As he got on, at the train manager's door, he started making his request and I went up the carriage and sat down.

The train manager stated he was unable to sell him a ticket that would take my friend from Melksham to Parkway via Swindon - the best he could do was to sell him a ticket to Swindon, and a Swindon to Parkway ticket, and claim a refund. Oh dear ... as you can imagine, my friend was not pleased, and came and sat across from me and told me what the Train manager had said.

The ticket manager did a ticket check, and having been filled in, as he came back I asked him if my friend could have made the journey on via Swindon on the trains he wanted on a Melksham to Severn Tunnel Junction ticket and get off short.  The train managwer looked puzzled, but looked it up on his machine and confirmed that would have been valid, and indeed lower cost than the pair trains offered.   This was the 12:18 from Westbury, and "as we know" it's used a a route learner / refresher for lobg distance crews.   This TM was unknown to me, and was based in Exeter - "we have to know this route for the sleeper" - but (and he confirmed) they don't know the wrinlkes of the fares here, which they really should if they are selling tickets. Or they should have a system that informs them as appropriate.

Long (b)log but
a) It is unfortunate that there are no Melksham to Parkway fares via the quickest route
b) It is doubly unfortunate that apps like Google (and the Interrail planner) offer this route
c) It is tripply  unfortunate that the TVM sells a slower, and restricted ticket without warning
d) It is four times unfortunate that the customer facing staff, on top of the first three problems, only offer an overpiced solution

Re: Wilts & Berks Canal - merged posts, ongoing developments and discussion
In "Heritage railways, Railtours, buses, canals, steamships and other public transport based attractions" [378522/28863/47]
Posted by grahame at 18:42, 21st August 2026
 
Could canals have any function as part of a national water grid?

There are elements.  Llangollen Canal - water from the upper reaches of the Dee for Chester.

Re: Wilts & Berks Canal - merged posts, ongoing developments and discussion
In "Heritage railways, Railtours, buses, canals, steamships and other public transport based attractions" [378521/28863/47]
Posted by Chris from Nailsea at 18:28, 21st August 2026
 
In terms of helping to drain it, possibly?   


Re: The Railway network in Wales as it might have looked
In "Shorter journeys in South and West Wales" [378520/29541/23]
Posted by Chris from Nailsea at 18:25, 21st August 2026
 
From the BBC video archives, but still worth watching, if you haven't before:

1964: The Welsh village famous for its name

What's in a name? Specifically, the name of the village:  Llanfairpwllgwyngyllgogerychwyrndrobwllllantysiliogogogoch

From the BBC Archive. This clip from Tonight was originally broadcast 18 August 1964.


It's a video clip, so you'll need to click here on the link to the BBC.

CfN. 

Re: Wilts & Berks Canal - merged posts, ongoing developments and discussion
In "Heritage railways, Railtours, buses, canals, steamships and other public transport based attractions" [378519/28863/47]
Posted by Trowres at 18:07, 21st August 2026
 
Could canals have any function as part of a national water grid?

Re: NPPF revisions - more homes can be built near stations?
In "Looking forward - the next 2, 5, 10 and 20 years" [378518/32385/40]
Posted by Trowres at 17:54, 21st August 2026
 
...
The top 60 travel to work areas in England have been expanded to 80 and notable additions in the South West are Trowbridge, Newbury, Poole and Cheltentham.  Most of the South East and Central Southern England is included, but further South West only the south of Devon through to Plymouth makes the grade.  Notably, Bath and Salisbury are not included.  Station service wise, the specification is two trains per hour acheievable in the peak direction, and we are looking as I read it as development totally within 800 metres of the station.
...

There is no mention of the word "peak" in the Lichfields report (nor in NPPF).

But, it was your reference to Trowbridge, Bath and Salisbury that was the eye-opener. My first thought (well, almost...) was:

"what were the designers of the station criteria trying to achieve?"

Firstly, the NPPF section we're concerned with here is covering developments outside settlements.
Exactly how settlement boundaries are calculated is a bit arcane, but I'm assuming that NPPF is relying on existing methods that do tend to produce something that appears intuitively right.

It's the development that has to outside the settlement, not the station. So, we could be looking at (for example) Castle Cary, where the station in in the fields, or we could be considering any station in a village or small town where an 800 metre walk could get you from the development to the station. Even a larger town, where the station is off-centre (Melksham?).

We've already discussed the service frequency. Whatever the detail, it's sensible for the policy to only permit development where the station is somewhat useful.

Now, why top 80 Travel-to-Work areas for GVA?

First thing to understand is where the TTW area concept comes from. According to Wikipedia https://en.wikipedia.org/wiki/Travel_to_work_area:
A travel to work area is a collection of wards for which "of the resident economically active population, at least 75% actually work in the area, and also, that of everyone working in the area, at least 75% actually live in the area".

I have no idea how the two criteria are manipulated in such a way that nowhere is left out of a TTW, but the resulting map can be seen at https://geoportal.statistics.gov.uk/documents/534c0129bdc14be5aa270a919668a3d4/explore

It mostly looks sort-of-realistic, although the Merthyr Tydfil TTW area, for example, looks unnatural (for want of a better term).

The TTWs represent areas with a high degree of self-containment; people both work and live in the same TTW.
However, there is a huge difference in the working population contained within these TTWs, which naturally affects the GVA obtained in each.
There's also a variation in the per-capita GVA: somehow, Swindon TTWA beats London into 2nd place and Salisbury, Trowbridge, Bath and Taunton come in that (decreasing GVA/cap) order in the 2023 data  

While the productivity (GVA/cap) is notable, I think the population variation between TTWAs is more significant. It appears that Bath TTWA has about three-quarters of the working population of Trowbridge TTWA.

What does this mean for the chances of station-related development? To be in the top 80 GVA list, your TTWA could be:
* an area of high population density
* an area that is not surrounded by competing work locations that eat into the size of the TTWA (and hence population and GVA - bye bye Bath)
* an area that is not so rural that the TTWA population is below (say) 100k (that's Taunton out...)

The TTWA criterion gives some odd results: Poole TTWA is OK for station-related development but Weston-S-M is not.

Thus, in summary, our hypothetical developer is looking for:
* A station in the fields or near the edge of an existing town;
* ... that has a frequent service to somewhere-or-other
* ... in an area that already has a high population and is not surrounded by other workplace destinations (so where are the trains going?).

"what were the designers of the station criteria trying to achieve?"

I still don't know.  

Re: Thames Valley infrastructure problems causing disruption elsewhere - 2026
In "Across the West" [378517/31163/26]
Posted by TaplowGreen at 17:49, 21st August 2026
 
Bit of variety today.......

Cancellations to services between Reading and London Paddington

Due to trespassers on the railway between Reading and London Paddington all lines are blocked.

Train services running to and from these stations may be cancelled or delayed. Disruption is expected until 18:45 21/08.

Re: North Cotswold line delays and cancellations - 2026
In "London to the Cotswolds" [378516/31371/14]
Posted by Chris from Nailsea at 17:36, 21st August 2026
 
I do sometimes wonder if GWR wouldn't be that upset if they didn't have to run trains to/from Hereford ...

What a scurrilous suggestion!     

CfN. 

Re: Wilts & Berks Canal - merged posts, ongoing developments and discussion
In "Heritage railways, Railtours, buses, canals, steamships and other public transport based attractions" [378515/28863/47]
Posted by Mark A at 17:29, 21st August 2026
 
Indeed, in 1971 we'd have encountered concerns about the extension to the Farmoor reservoir.

Turning to the canal issue, the additional costs imposed by providing a navigable channel are estimated at £20 - 40 million or ~0.5% of the costs of construction of the reservoir. Should the navigable channel need to be constructed 'Retrospectively' the additional work adds £100 million to that cost. (The reservoir construction budget will already include an amount for the provision of leisure and sports facilities / environmental mitigation / landscaping unrelated to the canal.)

An issue is that the planners, in regarding the benefits brought by a restored canal, will tend to put a value only on the length of new channel. They need to be motivated to include the 'Network effects' - the reservoir navigable channel bringing benefits the length of the 57 mile canal once established - and beyond that into the parts of the canal network that it will touch.

(This has something in common with new railway proposals, with people talking in terms of the benefits to e.g. 'Matlock - Buxton' when they should be talking 'North West - East Midlands: populations ~7 million and ~3.5 million respectively)

Mark

Re: NPPF revisions - more homes can be built near stations?
In "Looking forward - the next 2, 5, 10 and 20 years" [378514/32385/40]
Posted by grahame at 16:32, 21st August 2026
 
Yes;....so would apply if the service swapped direction midway through the day to maintain peak flow of 2tph....

That's the old fashioned way of doing it?   I remember from my commutes to school seeing a succession of trains in the morning peak coming up from Ashford and Hastings through Sevenoaks and Orpington headed for Cannon Street and Charing Cross.  During the day, the  overnight-empty shed at Grove Park and the sidings on Blackfriars Bridge were populated with 12 carriage trains, which in the evening headed out of town again having filled up with the same people they brought in that morning at one of the two termini.   During the day, services to / from Hastings were just hourly, just (!) 6 carriages, and all stations too once they got out beyond Tonbridge.

Re: NPPF revisions - more homes can be built near stations?
In "Looking forward - the next 2, 5, 10 and 20 years" [378513/32385/40]
Posted by ChrisB at 16:08, 21st August 2026
 
Yes;....so would apply if the service swapped direction midway through the day to maintain peak flow of 2tph....

Re: Wilts & Berks Canal - merged posts, ongoing developments and discussion
In "Heritage railways, Railtours, buses, canals, steamships and other public transport based attractions" [378512/28863/47]
Posted by ChrisB at 16:02, 21st August 2026
 
Indeed - if they actually already had a canal that was disused, then their request would hold more water. Just as they have an unconstructed [plan, it's at the same stage as the reservoir, but of course that is far more likely to get the funds for construction sooner. I agree with others that their request is a huge stretch & unlikely.

I doubt they were talking about this reservoir in 1971.....I have relatives in Sutton Courtenay, and they would have heard by then.

Re: NPPF revisions - more homes can be built near stations?
In "Looking forward - the next 2, 5, 10 and 20 years" [378511/32385/40]
Posted by Trowres at 15:58, 21st August 2026
 
Two tph in the peak direction?....

Do you mean "in the direction to which most people would be travelling" ?

The frequency of services, be it 2 or 4, had to be maintained "throughout the daytime"; whatever that means (longer in the summer?).


Re: Wilts & Berks Canal - merged posts, ongoing developments and discussion
In "Heritage railways, Railtours, buses, canals, steamships and other public transport based attractions" [378510/28863/47]
Posted by Mark A at 15:58, 21st August 2026
 
1971, and us, teenagers in a skiff, having arrived in Oxford via the canal, we headed up the Thames and I can't recall where a lunchtime stop was or what it was that indicated to us that the reservoir proposal was very much a live issue with the public - and I don't think this concerned the nearby Farmoor reservoir. The new reservoir here has been a very long time under discussion.

A day or so later, our attempt to reach Cricklade sputtered out and we stopped overnight at Castle Eaton - summer water levels were challenging and it emerged that not nearly enough people from Swindon could have been using the toilet that day. (The flow of the  River Ray, which joins the Thames about 3/4 mile below Cricklade was at that time very closely related to the output of the exemplary Swindon water treatment works...)

Mark


Re: North Cotswold line delays and cancellations - 2026
In "London to the Cotswolds" [378509/31371/14]
Posted by charles_uk at 15:33, 21st August 2026
 
I do sometimes wonder if GWR wouldn't be that upset if they didn't have to run trains to/from Hereford:

1P10 0523 Hereford to London Paddington cancelled due to late arrival of an inbound service (YI)

1W01 0952 London Paddington to Hereford cancelled due to the train being swapped (YU)

Re: Castle Cary station - services, incidents, facilities, car parking and awards (merged topic)
In "Heart of Wessex" [378508/618/19]
Posted by Mark A at 15:17, 21st August 2026
 
Somewhat similar colours on a door in this photo from the end of July 2006. This was the little corrugated iron station building at Trawscoed, at the end of its life, somewhat ruined and about to be swept away.

For a few months more, as a reminder of railway freight traffic, there would be coal on the platform. People would have to dig deep to recover memories of HRH Queen Elizabeth the Second's overnight stay there in 1955.

Mark


Re: Thames Valley infrastructure problems causing disruption elsewhere - 2026
In "Across the West" [378507/31163/26]
Posted by Trowres at 15:03, 21st August 2026
 
From the 2026 RT report that Stuving has found:
This activity aims to remove obsolete equipment and replace select assets with newer models with an improved reliability profile. Our W63 replacement programme continues to 2027 due to a revised plan.
• We are supplementing our W63 replacements with work on RT60 type points which increased in priority due to an FY26 increase in reliability issues. We are on plan for W63 replacements with delivery now transferred to the maintenance organisation. We have plans to deliver 13 sets of points in FY27, 9 in FY28, and 20 in FY29.
• In Period 2, RT60 points reliability saw numerous high impact failures and are now subject to concerted focus, including work with Technical Authority to re-design components for upgrade.
Replacement of these assets is aimed at reducing failure rates, improving reliability and simplifying maintenance activity.
Route-wide Points delay per incident has reduced from 3.9 in Period 08 FY24 to 2.0 in Period 13
FY26.

I haven't found anything to suggest that W63 is not a reference to a point operating machine. However, RT60 refers to a particular design for a complete point. Hard to find details of it, but here's a potential (or actual?) replacement...
https://www.thepwi.org/wp-content/uploads/2021/07/21-July-14-Why-NR60-Mk2-Ian-Bostock.pdf

Re: Thames Valley infrastructure problems causing disruption elsewhere - 2026
In "Across the West" [378506/31163/26]
Posted by stuving at 14:48, 21st August 2026
Already liked by Trowres
 
DU must mean delivery unit, in this context maintenance delivery unit. So the east one must be the MDU with the full name "Western East MDU".

(Sorry this map is a bit hard to read - it was like that in the document I stoleborrowed it from.)

Re: Thames Valley infrastructure problems causing disruption elsewhere - 2026
In "Across the West" [378505/31163/26]
Posted by Trowres at 14:16, 21st August 2026
 
Sorry, Stuving: I have now corrected the link in my previous post.

Re: Castle Cary station - services, incidents, facilities, car parking and awards (merged topic)
In "Heart of Wessex" [378504/618/19]
Posted by Chris from Nailsea at 13:50, 21st August 2026
 
An update, from the BBC:

Railway station gets heritage-inspired overhaul


The revamped waiting room at Castle Cary recalls the station's historic character - Image © Daniel Mumby

A railway station has been overhauled to acknowledge its heritage in an £835,000 refit.

The waiting room and ticket office at Castle Cary Station in Somerset has been refitted in a classic style, its original entrance has reopened and a new ramp for wheelchair-users has been installed.

More seating has been put in on the platform, along with a digital departure board and larger toilet and baby-changing facilities.

The project was funded by the government, which provided £560,000, together with £275,000 from the Railway Heritage Trust, which aims to maintain and preserve the historic features of British railways.

Castle Cary is one of Somerset's busiest railway stations and, as the main stop for Glastonbury Festival, serves more than 350,000 passengers each year.  The station has benefitted from investment in recent years - a new car park opened in March 2024 and the 567 bus route recently launched on a six-month trial basis to connect the station to Glastonbury and Street.

Sir Andrew Haines, chair of the Department for Transport Operator Limited, told the Local Democracy Reporting Service the revamp was a good example of "how we can provide meaningful benefits to the public while remaining true to the station's iconic heritage".

"I hope Castle Cary's passengers are pleased with the improvements and enjoy their journeys to and from this unique station," he said.

The ramp will allow wheelchair-users to access the ticket office and platform one of the station, but staff assistance will still be needed to reach platform two via the track-level barrow crossing.


The ticket office has been refitted as part of the £835,000 project - Image © Daniel Mumby

Tim Hedley Jones, director of the Railway Heritage Trust, told the BBC the changes were intended to give passengers "a positive experience of their time at the station".

"I'm particularly pleased to see the reproduction of the original Great Western Railway benches so that people can appreciate the quality of furniture that was provided in stations, and also the colours that were used," he said.  "This is about marketing the modern railway. Great Western Railway has had a lot of investment in new trains, and it's important to reflect that with investment in stations.

"Historic stations have character," he added. "This project, whilst also bringing back the old heritage at the station, removed the clutter and made it a much more positive experience for passengers in a modern context."


Re: Thames Valley infrastructure problems causing disruption elsewhere - 2026
In "Across the West" [378503/31163/26]
Posted by stuving at 13:12, 21st August 2026
 
Further grubbing located the Wales & Western Performance Improvement Plan (2024) at:
https://www.networkrail.co.uk/wp-content/uploads/2024/03/Wales-and-Western-CP7-Delivery-Plan.pdf

What I find at that link is not the 2024 improvement plan (I can't find that anywhere) but the CP7 plan. The NR page for the improvement plan only has a link the (April 2026) Performance Improvement Plan Report. That says, of the improvement plan,  "April 2026 NR transitions delivery of Plan into Business-as-Usual". There is also some rather cryptic reporting of the results for e.g. W63 points replacement.

Where did you find the improvement plan itself (as a PDF)?

Re: Thames Valley infrastructure problems causing disruption elsewhere - 2026
In "Across the West" [378502/31163/26]
Posted by Trowres at 12:11, 21st August 2026
 
Thanks, TG, for locating that thread.
It references the Network Rail CP7 Delivery Plan, which can be found at:
https://www.networkrail.co.uk/wp-content/uploads/2024/03/Wales-and-Western-CP7-Delivery-Plan.pdf

Further grubbing located the Wales & Western Performance Improvement Plan (2024) at:
https://www.networkrail.co.uk/wp-content/uploads/2024/11/Wales-Western-Region-Performance-Improvement-Plan.pdf

We have completed four phases of points resilience improvements works in the Thames Valley area. With the support of Intel Rail, we have scoped points for inclusion in a fifth phase of points resilience work based on previous failure history.
This work will include 25 point ends, which includes around 5% of the total population, but can be attributed to 45% of delay between P1 22/23 and P1 24/25. Previous phases have delivered a 60% uplift in points reliability.
Phase-5 will be completed in December 2025

Still very much a management-orientated description.  The only hint of hardware-specifics is:
W63 point machine conversions: Completion date 31:03:27 All W63 points replaced in East DU area

I guess that W63 refers to Westinghouse type M63 point machines; please correct me if you know otherwise, or if you can identify "East DU area" !

[edited to correct link]

 
The Coffee Shop forum is provided by customers of Great Western Railway (formerly First Great Western). The views expressed are those of the individual posters concerned. Visit https://www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site at admin@railcustomer.info if you feel that the content provided by one of our posters contravenes our posting rules. Our full legal statment is at https://www.greatwesternrailway.info/legal.html

Although we are planning ahead, we don't know what the future will bring here in the Coffee Shop. We have domains "firstgreatwestern.info" for w-a-y back and also "greatwesternrailway.info"; we can also answer to "greatbritishrailways.info" too. For the future, information about Great Brisish Railways, by customers and for customers.
 
Current Running
GWR trains from JourneyCheck
 
 
Code Updated 11th January 2025