| Re: Thames Valley infrastructure problems causing disruption elsewhere - 2026 In "Across the West" [378502/31163/26] Posted by Trowres at 12:11, 21st August 2026 | ![]() |
Thanks, TG, for locating that thread.
It references the Network Rail CP7 Delivery Plan, which can be found at:
https://www.networkrail.co.uk/wp-content/uploads/2024/03/Wales-and-Western-CP7-Delivery-Plan.pdf
Further grubbing located the Wales & Western Performance Improvement Plan (2024) at:
https://www.networkrail.co.uk/wp-content/uploads/2024/03/Wales-and-Western-CP7-Delivery-Plan.pdf
We have completed four phases of points resilience improvements works in the Thames Valley area. With the support of Intel Rail, we have scoped points for inclusion in a fifth phase of points resilience work based on previous failure history.
This work will include 25 point ends, which includes around 5% of the total population, but can be attributed to 45% of delay between P1 22/23 and P1 24/25. Previous phases have delivered a 60% uplift in points reliability.
Phase-5 will be completed in December 2025
This work will include 25 point ends, which includes around 5% of the total population, but can be attributed to 45% of delay between P1 22/23 and P1 24/25. Previous phases have delivered a 60% uplift in points reliability.
Phase-5 will be completed in December 2025
Still very much a management-orientated description. The only hint of hardware-specifics is:
W63 point machine conversions: Completion date 31:03:27 All W63 points replaced in East DU area
I guess that W63 refers to Westinghouse type M63 point machines; please correct me if you know otherwise, or if you can identify "East DU area" !
It has to be in the watercourse around the north and west of the reservoir really. There are several reasons why going through the reservoir wouldn't work, but principally that this is a 'bunded' reservoir raised above the nearby land on all sides, rather than a dammed valley. So you'd be locking up into the reservoir, crossing it, and then locking down again, losing water from the reservoir at each end.
I don't blame WBCT for asking for a fully constructed canal, and a bit of smart planning would see it funded by new housing and commercial development at locations along the way. But realistically I think the most they'll get is a channel of the relevant width and a promise not to block navigation in the future, and even that's a stretch.
(I'm reminded of the Droitwich Junction Canal, which was fortuitously able to make use of the Body Brook culvert under the M5 - constructed some 30 years before restoration - because someone in the Worcestershire county surveyor's office managed to get a 7ft width written into the plans...)
| Re: New station at North Filton - now named as 'Bristol Brabazon' - ongoing discussion In "Bristol and Bath (WECA, now WEMCA)" [378500/24927/21] Posted by Noggin at 10:42, 21st August 2026 | ![]() |
Wonder when this station will actually open. Hope we get news of an actual definite opening date sometime soon. So far we've been given an update of sometime in the autumn. Autumn ends on 30th November. On Realtimetrains it's showing the new Bristol Temple Meads-Bristol Brabazon services starting on Sunday 13th December with the 0908 service to Bristol Brabazon. That's the date when the new winter timetable starts. Hopefully the station and the new services actually ends up starting a bit before then.
Experience suggests that the majority of delays to station openings are caused by delays in local highways issues, but IIRC the public realm is all the developer's responsibility and reasonably straightforward.
Its a pretty standard Network Rail design - similar to Ashley Down, Charfield, Okehampton Interchange etc, so should be pretty much "tried and tested" by now.
IIRC, the service is already running but currently terminates at Filton, so hopefully no issues with rolling stock availability.
According to the University of Bristol website, the Temple Quarter Enterprise Campus is due to open on the 8th Sept. Has anyone heard anything about the new Temple Meads east entrance opening to coincide with this? Have they even installed the new gates yet?
Yes, all installed and ready to go AFAIK. There are definitely photos online.
As it happens, I took a detour on the way to work and walked past it this morning. The university plaza looks very smart indeed with paving and planting complete, just a few workers applying finishing touches.
Incidentally, the floating walkway along the river from the university to Temple Quay looks nearly complete, I think they just have the final ramp at the Temple Quay end to level and pave.
| Re: Thames Valley infrastructure problems causing disruption elsewhere - 2026 In "Across the West" [378498/31163/26] Posted by GBM at 09:44, 21st August 2026 | ![]() |
This may be what you're after?
https://www.firstgreatwestern.info/coffeeshop/index.php?topic=29248.0
There's a NR report from 2024 within the thread which details how they acknowledge that the Thames Valley/Paddington is a "critical corridor" and how they intend to improve its reliability.
I'd say they still have some way to go.
Some way to go? A very long way to go.
Do we still have ORR to re look at this issue I wonder, or is it all being woven into GBR, so nothing to be done for another long while!
| Re: Thames Valley infrastructure problems causing disruption elsewhere - 2026 In "Across the West" [378497/31163/26] Posted by TaplowGreen at 09:27, 21st August 2026 | ![]() |
I don't recall any communication from the industry to give an impression that they are "on top of the problem"... or even that it knows how to put the problem right.
A year ago/two years ago?
Somewhere discussed on this forum?

This may be what you're after?
https://www.firstgreatwestern.info/coffeeshop/index.php?topic=29248.0
There's a NR report from 2024 within the thread which details how they acknowledge that the Thames Valley/Paddington is a "critical corridor" and how they intend to improve its reliability.
I'd say they still have some way to go.
| Re: Cornish mainline and branch line delays - ongoing discussion In "Shorter journeys in Plymouth and Cornwall" [378496/28556/25] Posted by grahame at 08:47, 21st August 2026 | ![]() |
I make it that GWR are at least 4 serviceable trains down today. A sample from each diagram
18:59 Gatwick Airport to Reading due 20:30
18:59 Gatwick Airport to Reading due 20:30 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
16:23 Okehampton to Exeter Central due 17:07
16:23 Okehampton to Exeter Central due 17:07 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
16:20 Truro to Falmouth Docks due 16:44
16:20 Truro to Falmouth Docks due 16:44 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
15:15 Penzance to Plymouth due 17:18
15:15 Penzance to Plymouth due 17:18 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
07:19 Paignton to Exmouth due 08:49
07:19 Paignton to Exmouth due 08:49 has been cancelled.
This is due to a fault on this train.
There are some crew shortages cancelling trains Exeter <-> Penzance, and something under investigation on the Severn Beach lie with trains turning round at Clifton Down for - according to Journey check - for most of the rest of the day.
| Re: NPPF revisions - more homes can be built near stations? In "Looking forward - the next 2, 5, 10 and 20 years" [378495/32385/40] Posted by grahame at 08:32, 21st August 2026 | ![]() |
Two tph in the peak direction?....
I've been reading into this a bit more - a blog from Lichfields - in particular, travel-to-work areas, distances from stations, and services there.
The top 60 travel to work areas in England have been expanded to 80 and notable additions in the South West are Trowbridge, Newbury, Poole and Cheltentham. Most of the South East and Central Southern England is included, but further South West only the south of Devon through to Plymouth makes the grade. Notably, Bath and Salisbury are not included. Station service wise, the specification is two trains per hour acheievable in the peak direction, and we are looking as I read it as development totally within 800 metres of the station.
Where does that leave us in our region? If there are sites near existing town stations such as Trowbridge, there's an assumption to favour development, as there is near Dilton Marsh and Avoncliff, both of which have multiple peak hour trains that could call. Freshford is in the Bath travel to work area which is not a top one, and I question for Melksham as to whether 2 trains per hour can be achieved in "peak" direction - towards the named town in the area, perhaps, with a gap from 06:29 to 09:09 and nothing running through that could have a stop added. We do have 2 trains in the hour to Chippenham and Swindon - 07:21 and 08:02 and I wonder if they meet the criterion even though going out of area?
Looking wider in the Bristol region, Pilning seems to be an obvious choice with 4 (and soon to be 5?) trains per hour passig through with 2 each to Parkway and to Temple Meads which could have a stop added easily enough, and a lot of presently-green fields close to the station. The NPPF talks about travel TO work area and from comments I have seen nothing about travel FROM work, so it would appear that for people going home to Pilning, a bus from Severn Beach or doubling back at Severn Tunnel Junction would allow the presumtion to allow development to be met.
Futher afield still, stations I identified earlier at Menheniot, St Erth and Bedwyn are outside designated travel to work areas, but Mottisfont and Kintbury are in. Don't know about Dean - the trains stop in a top TTWA but the passenger exit is outside it.
| Re: Cornish mainline and branch line delays - ongoing discussion In "Shorter journeys in Plymouth and Cornwall" [378494/28556/25] Posted by GBM at 07:50, 21st August 2026 | ![]() |
Cancellations to services between Truro and Falmouth Docks
Due to more trains than usual needing repairs at the same time between Truro and Falmouth Docks fewer trains are able to run.
Train services running to and from these stations may be cancelled. Disruption is expected until the end of the day.
Customer Advice
-
What has happened?
-
One of the trains that operates the Truro to Falmouth Docks service has developed a fault that needs mechanical attention. We do have another train that is operating the service, which means we can only operate half of the service for the rest of today.
If you are wanting to travel to Falmouth, please check your journey and if there is not a service, we recommend take a local bus, where your ticket can be used at no extra cost.
| Re: Thames Valley infrastructure problems causing disruption elsewhere - 2026 In "Across the West" [378493/31163/26] Posted by GBM at 07:45, 21st August 2026 | ![]() |
I don't recall any communication from the industry to give an impression that they are "on top of the problem"... or even that it knows how to put the problem right.
A year ago/two years ago?
Somewhere discussed on this forum?

The WH Smiths at Swindon Station, at 17:00 yesterday, had it shutters down and a sign saying "temporarily closed". I have no clue how long temporary is or was - 10 minutes, the day, the week, the summer, or indefinite.
People carrying prams down the steps from the platform - "please use the handrail" instructions being impractical, and the lift out of order with a sign telling us that an engineer had been called.
A smart looking sign encourages you to walk to Fleming Way for bus connections, even though a significant number call just outside the station.
In the town centre, TJ Jones which includes the Post Office is having a closing down sale.
Gotta love Swindon!




I'm not sure that they'll win this unless an easy method of allowing narrowboats across the reservoir via locks?
That had occurred to me too. A little like other canals linking larger bodies of water...the Caledonian Canal springs to mind. I just wonder if boats on the reservoir would cause water quality issues....not that water companies seem to be too exercised about that matter these days.
| Re: Paddington <-> Bristol: service updates and amendments - ongoing discussion In "London to Swindon and Bristol" [378490/18525/10] Posted by Mark A at 21:03, 20th August 2026 | ![]() |
Twerton Short Tunnel's up for a heavy repair in the near future. Newspaper article.
Mark
https://www.bathecho.co.uk/news/community/council-approves-tunnel-repairs-impact-rail-services-119459/
| Re: NPPF revisions - more homes can be built near stations? In "Looking forward - the next 2, 5, 10 and 20 years" [378489/32385/40] Posted by ChrisB at 19:40, 20th August 2026 | ![]() |
Two tph in the peak direction?....
17:45 Swindon to Westbury due 18:26 will be starting late from Swindon.
This is due to a safety inspection of the track.
This is due to a safety inspection of the track.
Nice to see Graham on the platform at Melksham keeping an eye on things

It seems to me, if Thames Water goes ahead with their plans that the restored canal can follow the diverted watercourse that they are building around the western and northern edge of the reservoir.
17:50 Gloucester to Salisbury due 20:06
17:50 Gloucester to Salisbury due 20:06 is being delayed at Gloucester.
This is due to a late running train being in front of this one
17:45 Swindon to Westbury due 18:26 will be starting late from Swindon.
This is due to a safety inspection of the track.
This is due to a safety inspection of the track.

Still showing as delayed, no actual time.
EDIT: changed to 18:05, only 5 mins late
Indeed - on the way from Swindon. It just said "delayed" here too - left use guessing.
Very interesting odd working of another 166 - arrived at platform 3 from the west with a "this train does not stop here" announcement, some people got off, some remained on board and it left headed west again. Mystery as to what that was!
| Re: Bristol Temple Meads - station, facilities, incidents and events (merged posts) In "Bristol and Bath (WECA, now WEMCA)" [378484/10737/21] Posted by Trowres at 17:52, 20th August 2026 | ![]() |
I wonder how the seats in the "round room" compare with those on IETs?
17:45 Swindon to Westbury due 18:26 will be starting late from Swindon.
This is due to a safety inspection of the track.
This is due to a safety inspection of the track.

Still showing as delayed, no actual time.
EDIT: changed to 18:05, only 5 mins late
| Re: Newquay Line - services, incidents and improvements (merged posts) In "Shorter journeys in Plymouth and Cornwall" [378482/19772/25] Posted by plymothian at 17:48, 20th August 2026 | ![]() |
For some reason, multi-only sets keep being allocated to this splitting service.
| Re: NPPF revisions - more homes can be built near stations? In "Looking forward - the next 2, 5, 10 and 20 years" [378481/32385/40] Posted by Trowres at 17:44, 20th August 2026 | ![]() |
I have not (yet?) read the new NPPF - is the 4 trains an hour specified? Each way or a 30 minute service? Possible by stopping trains that already go through but don't stop? Looking at the line from London to Penzance, I would look at ... Kintbury, Bedwyn, Castle Cary, Tiverton Parkway, Menheniot, Bodmin Parkway, Lostwithiel, Par and St Erth as stations that may fit the criteria. Others across the GWR area which have at least 4 trains an hour passing through and that come to my mind are Avoncliff, Freshford, Newton St Cryes, Pilning, Dean and Mottisfont.
The NPPF refers to "well-connected stations" for which the following definition is provided:
Well-connected station: Railway stations and underground, tram and light rail stops located
within a top 80 Travel to Work Area located partially or fully within England by Gross Value
Added (GVA) and which, in the normal weekday timetable, are served (or have a
reasonable prospect of being served due to planned upgrades or through agreement with the
rail operator) throughout the daytime by at least four trains or trams per hour overall, or at
least two trains or trams per hour in any one direction.
within a top 80 Travel to Work Area located partially or fully within England by Gross Value
Added (GVA) and which, in the normal weekday timetable, are served (or have a
reasonable prospect of being served due to planned upgrades or through agreement with the
rail operator) throughout the daytime by at least four trains or trams per hour overall, or at
least two trains or trams per hour in any one direction.
I'm struggling with the last part; the criteria would be met of there were two trains toward the workplace hub, but none back? Or was it put in to refer to loop lines (like in Liverpool) where you only need trains in one direction around the loop?
17:45 Swindon to Westbury due 18:26
17:45 Swindon to Westbury due 18:26 will be starting late from Swindon.
This is due to a safety inspection of the track.
17:45 Swindon to Westbury due 18:26 will be starting late from Swindon.
This is due to a safety inspection of the track.
| Re: Thames Valley infrastructure problems causing disruption elsewhere - 2026 In "Across the West" [378479/31163/26] Posted by Trowres at 17:33, 20th August 2026 | ![]() |
I would like to see the output of any investigation that has been done on why these points are failing.
Surely there must have been such a study?... including the causes of failure; which types of equipment are most liable to conk out, etc.
I don't recall any communication from the industry to give an impression that they are "on top of the problem"... or even that it knows how to put the problem right.
| Re: Thames Valley infrastructure problems causing disruption elsewhere - 2026 In "Across the West" [378478/31163/26] Posted by NickB at 17:00, 20th August 2026 | ![]() |
‘Better’ is a relative statement.
| Re: Thames Valley infrastructure problems causing disruption elsewhere - 2026 In "Across the West" [378477/31163/26] Posted by GBM at 16:28, 20th August 2026 | ![]() |
I thought Network Rail admitted there had been a problem with this area, and were concentrating on making it all better?
| Re: Thames Valley infrastructure problems causing disruption elsewhere - 2026 In "Across the West" [378476/31163/26] Posted by TaplowGreen at 16:11, 20th August 2026 | ![]() |
........and again!

Cancellations to services between London Paddington and Reading
Due to a points failure between London Paddington and Reading fewer trains are able to run on some Slough lines.
Train services running to and from these stations may be cancelled or delayed. Disruption is expected until 17:00 20/08.
Customer Advice
-
What has happened?
-
There has been a points failure in the Slough area.
Ok, having consulted various maps, I can see that the eastern leg of the canal reaches the Thames actually to the east of Abingdon - south of Culham, and yes, the reservoir does rather obliterate a small part of the canal and a larger part of 'new' canal that will replace the route of the old canal.
I'm not sure that they'll win this unless an easy method of allowing narrowboats across the reservoir via locks?
| Re: Derailment, Wickford,14th August 2026 In "The Wider Picture in the United Kingdom" [378474/32365/51] Posted by ChrisB at 15:15, 20th August 2026 | ![]() |
Still ongoing, no reopening date yet available.
| Re: Lewes, East Sussex - derailment of train, 20 injured, 13 August 2026 In "The Wider Picture in the United Kingdom" [378473/32362/51] Posted by ChrisB at 15:13, 20th August 2026 | ![]() |
I noted - and comment made elsewhere - that the front 4 carriages of the train (which did not derail) were in the new GBR livery. Whilst we must wait for the RAIB there is no suggestion, nor ongoing research planned according to their initial reports, that the paint job on the train was anything to do with the accident. However, does it now "mark" this unit as being "one of the ones involved at Lewes" and might we anticipate a further repaint to avoid passengers on future journeys being aware of this part of its history?
Doubt it - they'll just 'repaint'/revinyl another set/s surely? Then you won't be able to tell very easily....
Anyway, off to Selhurst depot (via Newhaven! & Brighton apparently)
Reopening on September 1