GDPR / Cookie acceptance [about our cookies] • • • Cookies expire in a week!
Pelleponese Railway. (Out of use, but now, multiple threats)
 
Pelleponese Railway. (Out of use, but now, multiple threats)
Posted by Mark A at 17:50, 20th October 2026
 
Namely, proposals for the hq and the routes converted to cycle paths.

https://www.tovima.com/society/grave-setback-for-peloponnese-railway-revival/

Re: Pelleponese Railway. (Out of use, but now, multiple threats)
Posted by grahame at 19:37, 20th October 2026
 
Namely, proposals for the hq and the routes converted to cycle paths.

https://www.tovima.com/society/grave-setback-for-peloponnese-railway-revival/

All across Europe, railways were built from perhaps 18xx to 1926, perhaps to an excess for what's justified for 2026. You could, perhaps, say that the Beeching report and subsequent closures did us a long term favour.   I've seen in Italy and France, and in the Balkans, lines on the maps of a couple of years ago that are no longer running, and this week in another country there are heavily engineered lines with few trains that has me wondering about these economics, and a rail replacement bus that often keeps time with the train timetable.   Sadly, the closure pendulum can swing too far as we see in Ireland.

Re: Pelleponese Railway. (Out of use, but now, multiple threats)
Posted by Mark A at 20:53, 20th October 2026
 
Those lines shut up shop in 2011, a few years after the huge superyacht builders saw their market bloom. Not saying that correlation is causation of course.

Visiting that part of Greece shortly after the Euro arrived there and landing at Kalamata airport in questionable weather, an airport where it wasn't a particularly good idea to point a camera at various things, I noted the railway line crossing the runway at the airport perimeter - a surely out of use by then branch from the city - which we didn't really touch as we were heading out in the other direction. This being a two centre break, on the journey across to Napflio there was an occasional glimpse of the railway doing something circuitous - and later, on the other side of the country near Argos the sight of a small shuttlecock shaped train moving at a surprising speed through the landscape.

Napflio's railway had been moved from its town centre site to a smaller platform on a new spur beyond the outskirts but that too has now closed. At the time we could have used the railway to reach the archaeology at Tyrins - well, we could have done but the timetable was thin to the point of extinction and the bus service ran cheerfully from the middle of town.

(While awaiting the bus, a Greek family's car stopped outside the building, they hastily left it and raised the bonnet to reveal the source of the smoke from the conflagration beneath. Cue everyone knowing what to do, various drinking water bottles retrieved from cafes and the fire given a thorough drenching. To my surprise it co-operated and went out. To my greater surprise the vehicle was still prepared to be driven, in piled the family and off they went...)

 
The Coffee Shop forum is provided by customers of Great Western Railway (formerly First Great Western). The views expressed are those of the individual posters concerned. Visit https://www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site at admin@railcustomer.info if you feel that the content provided by one of our posters contravenes our posting rules. Our full legal statment is at https://www.greatwesternrailway.info/legal.html

Although we are planning ahead, we don't know what the future will bring here in the Coffee Shop. We have domains "firstgreatwestern.info" for w-a-y back and also "greatwesternrailway.info"; we can also answer to "greatbritishrailways.info" too. For the future, information about Great Brisish Railways, by customers and for customers.
 
Current Running
GWR trains from JourneyCheck
 
 
Code Updated 11th January 2025