Railway station could get 300 extra trains a week thanks to £1.75billion project
As at 9th March 2025 22:46 GMT
 
Re: Railway station could get 300 extra trains a week thanks to £1.75billion project
Posted by Noggin at 18:28, 24th February 2025
 
Ah, Lib Dem MP on pre-election manoevres perhaps?

Didn't think the Midlands Rail Hub was a done deal by any means.

IIRC the proposal was a train per hour from Birmingham to Cardiff, and one per hour from Birmingham to Bristol, possibly joining at Cheltenham Spa (though that seems a bit dubious operationally)

Re: Railway station could get 300 extra trains a week thanks to £1.75billion project
Posted by ellendune at 10:49, 24th February 2025
 
So tempting to mention dreams of a reinstatement of the route to Birmingham "via Honeybourne"

The Midland line up as far as Abbotswood Jcn is going to be very congested with these extras each needing a path, plus the pfaffing about required for a train from the Birmingham direction terminating and reversing at Cheltenham Spa Lansdown

Why would it need to terminate at Cheltenham when it could go on to Gloucester where there is surely plenty of space. 

Re: Railway station could get 300 extra trains a week thanks to £1.75billion project
Posted by Witham Bobby at 09:30, 24th February 2025
 
So tempting to mention dreams of a reinstatement of the route to Birmingham "via Honeybourne"

The Midland line up as far as Abbotswood Jcn is going to be very congested with these extras each needing a path, plus the pfaffing about required for a train from the Birmingham direction terminating and reversing at Cheltenham Spa Lansdown

Re: Railway station could get 300 extra trains a week thanks to £1.75billion project
Posted by IndustryInsider at 06:13, 24th February 2025
 
There were proposals for two south facing bays fairly recently, so perhaps they will resurface if more trains will be using what is already a very congested station?

Re: Railway station could get 300 extra trains a week thanks to £1.75billion project
Posted by infoman at 05:19, 24th February 2025
 
What I would like to see at Cheltenham is a cross over south of the station so terminating trains could save going into the sidings,
with an extra platform next to the south bound platform so that trains could stable there as well,save going into the sidings

On the North bound side,why not have a bi-directional platform,so late arrivals could a more or less effect an immediate departure.

I would like to say about the over head wires for electrification,but newer technology might have more of a say in any decision on over head wires in the future.

Railway station could get 300 extra trains a week thanks to £1.75billion project
Posted by ChrisB at 19:47, 23rd February 2025
 
From Business Live, via MSN

Plans are underway for nearly 300 additional trains to pass through Cheltenham Spa railway station each week, thanks to a £1.75 billion hub project. Cheltenham MP Max Wilkinson met with Midlands Connect and rail executives on Wednesday to discuss the plans.

The Midlands Rail Hub project, valued at £1.75 billion, is set to provide approximately four million extra seats annually for passengers travelling between Cheltenham and Birmingham. This will be achieved by adding an extra four trains per hour on the route, two in each direction.

In 2023, the previous Government pledged full delivery of the Midlands Rail Hub, and in February last year, an additional £123m was allocated towards the project for detailed engineering designs. Construction is slated to run from 2025 to 2033.

Max Wilkinson said: "Cheltenham's rail connections are very important for our local economy. Improved links are vital for our town – primarily for business travellers, but also for leisure trips.

"Whether it's to the Midlands, towards Bristol, the North or London, we'll benefit from easier access to and from our town.

"I'm interested to hear more about the positive opportunities offered by the Midlands Rail Hub and other future Improvements too."

Paul Butters, director of communications at Midlands Connect, said: "It was great to meet Max, brief him on the plans and explain how the Midlands Rail Hub could deliver a massive transport boost for the town.

"Delivering faster and more frequent trains to Cheltenham would make a massive difference and we are working hard to deliver it.

"I look forward to working with Max in the months and years ahead to deliver this vital scheme for the region."

The meeting also included representatives from the West Midlands Rail Executive.

 
The Coffee Shop forum is provided by customers of Great Western Railway (formerly First Great Western). The views expressed are those of the individual posters concerned. Visit https://www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site at admin@railcustomer.info if you feel that the content provided by one of our posters contravenes our posting rules. Our full legal statment is at https://www.greatwesternrailway.info/legal.html

Although we are planning ahead, we don't know what the future will bring here in the Coffee Shop. We have domains "firstgreatwestern.info" for w-a-y back and also "greatwesternrailway.info"; we can also answer to "greatbritishrailways.info" too. For the future, information about Great Brisish Railways, by customers and for customers.
 
Current Running
GWR trains from JourneyCheck
 
 
Code Updated 11th January 2025