Re: North Cotswold line delays and cancellations - 2025
 
Re: North Cotswold line delays and cancellations - 2025
Posted by Richard Fairhurst at 23:01, 2nd October 2025
 
"Short run" in both senses, because it was five carriages rather than nine. Looked like it was about to get very cosy at Oxford on its return journey.

(I caught the same train both from Oxford to Charlbury at 1.10pm-ish and then from Charlbury to Oxford at 5.12pm for, well, reasons.)

Re: North Cotswold line delays and cancellations - 2025
Posted by Witham Bobby at 13:59, 2nd October 2025
 
11:52 London Paddington to Hereford due 14:44 will be terminated at Great Malvern.
It will no longer call at Colwall, Ledbury and Hereford.
It is being delayed between Reading and Oxford and is now expected to be 31 minutes late.
This is due to a fault on this train.
Last Updated:02/10/2025 12:52


15:18 Hereford to London Paddington due 18:29 will be started from Great Malvern.
It will no longer call at Hereford, Ledbury and Colwall.
This is due to a fault on this train.
Last Updated:02/10/2025 12:52

I reckon this service is probably the most likely to be short run across the entire GW network

Cancelled beyond Great Malvern today.  Not by any means a rare event

Re: North Cotswold line delays and cancellations - 2025
Posted by Mark A at 10:05, 2nd October 2025
 
Missing a single stop counts as a cancellation for the people intending to board or alight there, it has to be said.

Mark

Re: North Cotswold line delays and cancellations - 2025
Posted by Witham Bobby at 09:56, 2nd October 2025
 
RTT reports !W15 0750 Paddington - Great Malvern is cancelled today.  No reason given, but it's honest that most people who wanted to use the train will not be able to do that

Journey Check, however, pretends that the service is still running.  Just not running quite as scheduled

07:50 London Paddington to Great Malvern due 10:14 will be started from Worcester Shrub Hill.
It will no longer call at London Paddington, Reading, Oxford, Hanborough, Charlbury, Kingham, Moreton-In-Marsh, Honeybourne, Evesham, Pershore and Worcestershire Parkway Hl.
This is due to more trains than usual needing repairs at the same time.
Last Updated:02/10/2025 04:43

Operating a service over seven miles out of a planned 120 counts as close to a cancellation as makes no difference, in my book

Re: North Cotswold line delays and cancellations - 2025
Posted by Witham Bobby at 15:09, 30th September 2025
 
Swan Disruption

Cancellations to services between Great Malvern and Hereford
Due to a train hitting an obstruction on the line earlier today between Great Malvern and Hereford fewer trains are able to run.
Train services running through these stations may be cancelled. Disruption is expected until 16:00 30/09.
Customer Advice
What has happened?
-
A train was damaged from a swan being on the line, which has called delays to other train services. This in turn means that the train to Hereford is running very late so will be terminated at Great Malvern to enable the return service to run on time back to London Paddington
-
What are we doing about it?
-
GWR arranged for the damaged train to be moved to the maintanace depot

Need to be careful with them swans.  They'll break your arm, you know

Re: North Cotswold line delays and cancellations - 2025
Posted by Richard Fairhurst at 13:05, 30th September 2025
 
Mrs F (who was planning to catch that, and ended up on the next service) confirms that it indeed did!

Re: North Cotswold line delays and cancellations - 2025
Posted by Witham Bobby at 12:15, 30th September 2025
 
According to RTT, today's 1P02 0523 Hereford to Paddington:

This service was cancelled due to a problem with the traction equipment (MD).

Must have resulted in the next working being a bit crowded


Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 15:56, 26th September 2025
 
Friday September 26

1W21 1053 London Paddington to Worcester Shrub Hill (13:01) : departed +14, arrived +24.
1W02 1152 London Paddington to Hereford : held Evesham (+23) for 1P30, arrived Great Malvern +30 and cancelled thereafter.
1W25 1252 London Paddington to Worcester Foregate St (15:00) : arrived Shrub Hill +15  and cancelled thereafter.

1P30 1316 Worcester Shrub Hill to London Paddington : departed +15,  arrived +32.

15:18 Worcester Foregate Street to London Paddington due 17:29 will be started from Worcester Shrub Hill.
This is due to a speed restriction over defective track.
Last Updated:26/09/2025 15:05

15:18 Hereford to London Paddington due 18:29 will be started from Great Malvern.
This is due to congestion.
Last Updated:26/09/2025 14:20


Re: North Cotswold line delays and cancellations - 2025
Posted by Richard Fairhurst at 09:57, 26th September 2025
 
It was also short-formed (5 carriages vs 9) so got very cosy at Oxford!

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 14:46, 25th September 2025
 
Thursday September 25

11:52 London Paddington to Hereford due 14:44 will be terminated at Great Malvern.
It has been delayed at London Paddington and is now 19 minutes late.
This is due to a fault on this train.
Last Updated:25/09/2025 14:06
Departed Paddington +19, held Shrub Hill (+30) and Foregate St (+40), arrived Great Malvern +48.

15:18 Hereford to London Paddington due 18:29 will be started from Great Malvern.
This is due to a fault on this train.
Last Updated:25/09/2025 14:06

Re: North Cotswold line delays and cancellations - 2025
Posted by Mark A at 12:04, 24th September 2025
 
Thanks, both. A pdf on how this all works answered my next question - how does the signaller know that everything has has been successfully positioned. (Answer, position-detection, and interlocking of that with the signalling...)

Mark

https://www.thepwi.org/wp-content/uploads/2022/10/Journal-2022_10-Vol140-Pt4_Back-to-basics-Points-Part-1-of-2.pdf

Re: North Cotswold line delays and cancellations - 2025
Posted by Oxonhutch at 11:24, 24th September 2025
 
350 yards sounds like a monster - and yes, I can imagine that every installation would require a different knack to shift it successfully - and perhaps different depending on the time of day, sun, shade, weather.

Mark

On a heritage line that I work, one distant set of mechanical points are more easily changed in wet weather, rather than dry, when the initial momentum imparted can carry them over their travel. Likewise one cross-over near to the 'box can be an absolute brute in certain weather/temperature.

Princes Risborough North has a Westinghouse point hand-wound generator but it isn't connected to any points. Two large incandescent bulbs provide the necessary resistance and a demonstration of the resultant power generated by human effort.

Re: North Cotswold line delays and cancellations - 2025
Posted by Witham Bobby at 10:14, 24th September 2025
 
350 yards sounds like a monster - and yes, I can imagine that every installation would require a different knack to shift it successfully - and perhaps different depending on the time of day, sun, shade, weather.

Mark

Getting completely off topic now, but the worst ones to move weren't always the most remote from the lever frame

The trailing crossover between the mains at Witham (No 33 from memory) was only a few yards from the 'box but was a really heavy pull, and even heavier to put back normal

Re: North Cotswold line delays and cancellations - 2025
Posted by Mark A at 09:18, 24th September 2025
 
350 yards sounds like a monster - and yes, I can imagine that every installation would require a different knack to shift it successfully - and perhaps different depending on the time of day, sun, shade, weather.

Mark

Re: North Cotswold line delays and cancellations - 2025
Posted by Witham Bobby at 09:15, 24th September 2025
 
Mechanical boxes that had power-worked points and locks (the maximum distance for rodding-run signalman power was 350 yds) would have a "hurdy gurdy".  A generator worked by winding a handle on the side of a huge cast steel casing.  These took an age and much cranking to swing points over.  Horrible things

Do any of these survive, either at a heritage railway or in a museum?

I'm not sure.  Where there was mains power, these hand cranked generators (a Westinghouse Brake & Signal Co product) were used as backups for mains failure.  They may still exist in some places on the big railway.  I wonder if there's one at Blue Anchor or Williton on the WSR?  Both have had mechanically worked points converted from rodding run to motor in more recent years.  Longer rodding runs are heavy to shift, and can cause maintenance and adjustment issues.  There's a definite knack to swinging the lever, and it's different for every point/lock

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 08:09, 24th September 2025
 
Mechanical boxes that had power-worked points and locks (the maximum distance for rodding-run signalman power was 350 yds) would have a "hurdy gurdy".  A generator worked by winding a handle on the side of a huge cast steel casing.  These took an age and much cranking to swing points over.  Horrible things

Do any of these survive, either at a heritage railway or in a museum?

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 07:54, 24th September 2025
 
Tuesday September 24

And after yesterday, Tuesday was (thank goodness) uneventful.

Wednesday September 25

07:13 Great Malvern to London Paddington due 09:42 will be started from Worcester Shrub Hill.
This is due to train crew being delayed.
Last Updated:24/09/2025 06:12

"Train crew being delayed" at 07:13? The first journey for this unit is from Stoke Gifford (depart 04:40) to Great Malvern to start in service.

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 06:09, 23rd September 2025
 
Final scores for Monday September 22:

1P11 05:16 Worcester Shrub Hill to London Paddington (07:24) : OK
1P02 05:23 Hereford to London Paddington (08:24) : cancelled throughout due to Sunday's electrical problem
1P16 06:43 Worcester Shrub Hill to London Paddington (08:44) : departed on time, held Norton (+57), delayed between there and Evesham (+83), arrived +92.
2E80 07:00 Worcester Shrub Hill to Didcot Parkway (08:46) : cancelled throughout.
1P18 07:13 Great Malvern to London Paddington (09:42) : held Foregate St (+23) and Shrub Hill (+39), operated via Stroud, arrived +32.
1P20 08:18 Worcester Shrub Hill to London Paddington (10:25) : operated via Stroud, arrived +12.
1P22 08:56 Great Malvern to London Paddington (11:27) : started from Moreton.
1P24 09:56 Great Malvern to London Paddington (12:23) : started from Oxford.
1P26 10:59 Great Malvern to London Paddington (13:25) : started from Oxford.
1P28 11:58 Great Malvern to London Paddington (14:23) : cancelled throughout.
1P30 13:16 Shrub Hill to London Paddington (15:22) : cancelled throughout.
1P04 13:18 Hereford to London Paddington (16:24) : started from Oxford, arrived +20.
1P34 15:18 Foregate St to London Paddington (17:29) : cancelled throughout. Ran ECS from Oxford (+27), arrived +30.
1P05 15:18 Hereford to Paddington (18:29) : started from Oxford (+27), arrived +20.
1P38 16:32 Great Malvern to London Paddington (19:29) : started from Foregate St (+11), held Charlbury (+24), arrived +24.
1P39 17:26 Foregate St to London Paddington (19:52) : started from Oxford (+17), arrived +19.
1P40 18:02 Foregate Street to London Paddington (20:29) : started from Shrub Hill (+8), held Norton (+15), arrived +5.
2E16 18:51 Evesham to Oxford (19:50) : cancelled throughout.
1P42 19:02 Great Malvern to London Paddington (21:26) : OK
1P44 19:45 Great Malvern to London Paddington (22:24) : started from Shrub Hill, held Norton (+6), saved 8 at Charlbury
1P46 20:56 Worcester Foregate Street to London Paddington (23:29) : cancelled throughout "due to a broken down train".
1P06 22:00 Hereford to London Paddington (01:17) : OK

First Worcester - Oxford after the disruption was 1P38, 16:46 from Foregate St (+11).

2E77 05:10 Oxford to Worcester Shrub Hill (06:15) : OK
1W11 05:53 London Paddington to Great Malvern (08:38) : cancelled after Moreton-in-Marsh
1W13 06:52 London Paddington to Great Malvern (09:29) : cancelled after Oxford
1W15 07:50 London Paddington to Great Malvern (10:14) : cancelled after Oxford
1W17 08:52 London Paddington to Great Malvern (11:14) : cancelled after Moreton-in-Marsh
1W01 09:52 London Paddington to Hereford (12:46) : cancelled after Oxford
1W21 10:53 London Paddington to Worcester Shrub Hill (13:01) : cancelled after Moreton-in-Marsh
1W02 11:52 London Paddington to Hereford (14:44) : cancelled after Oxford
1W25 12:52 London Paddington to Worcester Foregate Street (15:00) : cancelled after Oxford
1W27 13:50 London Paddington to Great Malvern (16:15) : cancelled after Oxford
1W29 14:53 London Paddington to Foregate Street (17:04) : cancelled throughout.
1W30 15:23 London Paddington to Foregate Street (17:47) : held Oxford (+26), arrived Shrub Hill +31 and cancelled thereafter.
1W31 15:52 London Paddington to Great Malvern (18:26) : delayed before Oxford (+28), held Wolvercote (+32), saved 13 at Evesham, arrived +29.
2E14 17:04 Didcot to Evesham (18:23) : departed +30, arrived Oxford +34 and cancelled thereafter.
1W33 16:58 London Paddington to Great Malvern (19:25) : departed +12, Oxford +21, Evesham +37, arrived Shrub Hill +39 and cancelled thereafter
1W03 17:34 London Paddington to Hereford (20:25) : held Wolvercote (+17) and Evesham (+40), arrived +47.
1W34 17:57 London Paddington to Worcester Foregate Street (20:11) : cancelled throughout "due to a broken down train"
1W36 18:57 London Paddington to Great Malvern (21:18) : OK
1W05 19:53 London Paddington to Hereford (22:57) : OK
1W41 20:52 London Paddington to Great Malvern (23:13) : OK
1W43 21:53 London Paddington to Worcester Shrub Hill (00:01) : OK
1W45 22:51 London Paddington to Worcestershire Parkway (01:06) : OK

First Oxford - Worcester train (after the 05:16) was 1W30, scheduled 16:22, actual 16:48.

Re: North Cotswold line delays and cancellations - 2025
Posted by ray951 at 20:07, 22nd September 2025
 
I agree it was a shambles.

The 1523 Paddington to Worcester Foregate Street sat at Oxford for 26 minutes and at the same time the 1518 Worcester Foregate Street to Paddington, which was due to start from Oxford at 1631 sat there for about 20 minutes which means platform 3 and 4 where both occupied at the same time causing massive delays to all other services.

I notice that it says the 1518 was cancelled due to a 'Safety Inspection on this train' that is interesting because the driver announced that it was cancelled due to no Train Manager. Looking at RealTimeTrains it seems to have had no problem then working empty to Paddington and onto Penzance. Given you can run an IET as DOO from Oxford to Paddington I don't understand why it was cancelled?

Re: North Cotswold line delays and cancellations - 2025
Posted by Witham Bobby at 17:06, 22nd September 2025
 
15:18 Worcester Foregate Street to London Paddington due 17:29 has been cancelled.
This is due to a safety inspection on a train.
Last Updated:22/09/2025 16:52

17:57 London Paddington to Worcester Foregate Street due 20:11 will be cancelled.
This is due to a broken down train.
Last Updated:22/09/2025 14:26

20:56 Worcester Foregate Street to London Paddington due 23:29
20:56 Worcester Foregate Street to London Paddington due 23:29 will be cancelled.
This is due to a broken down train.
Last Updated:22/09/2025 14:27

Quite the shambles, isn't it?

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 16:19, 22nd September 2025
 
Positive news (though some of it is ambiguous):
Cancellations to services between Moreton-In-Marsh and Worcestershire Parkway Ll
Following a safety inspection of the track between Moreton-In-Marsh and Worcestershire Parkway Ll all lines will be reopened shortly.
Train services running through these stations will be cancelled. Disruption is expected until the end of the day.
Customer Advice
Due to a safety inspection of the track, we are currently unable to run any trains between Moreton-in-Marsh and Worcestershire Parkway.
Last Updated:22/09/2025 14:48

14:55 Moreton-In-Marsh to Oxford due 15:35
An additional train service has been planned to operate as shown 14:55 Moreton-In-Marsh to Oxford due 15:35.
Last Updated:22/09/2025 14:51

13:50 London Paddington to Great Malvern due 16:15 will be delayed at Oxford.
This is due to a safety inspection of the track earlier today.
Last Updated:22/09/2025 14:42

14:53 London Paddington to Worcester Foregate Street due 17:04 will be started from Oxford.
This is due to a safety inspection of the track earlier today.
Last Updated:22/09/2025 14:26

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 14:07, 22nd September 2025
 
First thing this morning we had 1P11 05:16 Worcester Shrub Hill to London Paddington travel eastbound OK, and 2E77 0510 Oxford to Worcester Shrub Hill (the positioning journey for the halts train) travel westbound OK.

The halts train, 2E80 0700 Worcester Shrub Hill to Didcot Parkway, was cancelled "due to a problem with signalling equipment (J3)".

The unit has been trapped at Shrub Hill, but ran back to Oxford, departing at 11:06. It took an hour (11:17-12:18) between Norton and Evesham. But arrived at Oxford at 13:05.

JourneyCheck is now reporting disruption until the end of the day:
Cancellations to services between Moreton-In-Marsh and Worcestershire Parkway Ll
Due to a safety inspection of the track between Moreton-In-Marsh and Worcestershire Parkway Ll all lines are blocked.
Train services running through these stations will be cancelled. Disruption is expected until the end of the day.

Re: North Cotswold line delays and cancellations - 2025
Posted by ChrisB at 12:28, 22nd September 2025
 
Now until 1600.....how long does it take?? Find a fuse?

Re: North Cotswold line delays and cancellations - 2025
Posted by Witham Bobby at 12:25, 22nd September 2025
 
Nothing between Moreton in Marsh and Worcester because of a track inspection, 22/09/2025 ...

Due to a safety inspection of the track between Moreton-In-Marsh and Worcestershire Parkway Ll all lines are blocked.
Train services running through these stations will be cancelled. Disruption is expected until 14:00 22/09.
Customer Advice
Due to a safety inspection of the track, we are currently unable to run any trains between Moreton-in-Marsh and Worcestershire Parkway.
-
Rail replacement transport has been requested in the form of coaches. Coaches will shuttle between Moreton-in-Marsh and Worcester Shrub Hill until further notice.

Last Updated:22/09/2025 12:12

Re: North Cotswold line delays and cancellations - 2025
Posted by Witham Bobby at 08:59, 22nd September 2025
 
There was a powercut in Moreton overnight which I guess might have affected the signalbox in some way? But don't they have generators on stand-by?

There certainly wasn't a standby generator there back when I last worked the 'box in 1974.  But things have changed a bit since then, not least the CCTV supervised level crossings at Blockley and Chipping Campden, and the re-doubling of the line to Evesham.

Mechanical boxes that had power-worked points and locks (the maximum distance for rodding-run signalman power was 350 yds) would have a "hurdy gurdy".  A generator worked by winding a handle on the side of a huge cast steel casing.  These took an age and much cranking to swing points over.  Horrible things

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 07:32, 22nd September 2025
 
Monday September 22

And after yesterday, "a fault with the signalling system" continues, though it's only flagged up on JourneyCheck's 'Line Updates' section at 08:19:

Cancellations to services between Worcestershire Parkway Ll and Moreton-In-Marsh
Due to a fault with the signalling system between Worcestershire Parkway Ll and Moreton-In-Marsh all lines are blocked.
Train services running through these stations may be cancelled. Disruption is expected until 10:00 22/09.
Customer Advice
Due to a fault with the signalling system, we are currently unable to run any trains between Worcestershire Parkway and Moreton-in-Marsh.
...
Last Updated:22/09/2025 08:19

...which has now changed to a "safety inspection of the track":
Cancellations to services between Moreton-In-Marsh and Worcestershire Parkway Ll
Due to a safety inspection of the track between Moreton-In-Marsh and Worcestershire Parkway Ll all lines are blocked.
Train services running through these stations will be cancelled. Disruption is expected until 13:00 22/09.
Customer Advice
Due to a safety inspection of the track, we are currently unable to run any trains between Moreton-in-Marsh and Worcestershire Parkway.
...
Last Updated:22/09/2025 09:47

05:23 Hereford to London Paddington due 08:24 will be cancelled.
This is due to failure of the electricity supply.
Last Updated:22/09/2025 00:34

06:43 Worcester Shrub Hill to London Paddington due 08:44 has been cancelled.
This is due to a fault with the signalling system.
Last Updated:22/09/2025 07:27

But a bit later:
06:43 Worcester Shrub Hill to London Paddington due 08:44 has been reinstated.
It is being delayed at Worcester Shrub Hill.
This is due to a fault with the signalling system.
Last Updated:22/09/2025 07:33
Departed Shrub Hill on time, held Norton (+57). Delayed between there and Evesham +83, arrived +92.

07:00 Worcester Shrub Hill to Didcot Parkway due 08:46 has been cancelled.
This is due to a fault with the signalling system.
Last Updated:22/09/2025 07:26

07:13 Great Malvern to London Paddington due 09:42 will be diverted between Worcester Shrub Hill and Reading.
It has been delayed between Worcester Foregate Street and Worcester Shrub Hill and is now 39 minutes late.
This is due to a fault with the signalling system.
Last Updated:22/09/2025 08:17
Held Foregate St (+23) and Shrub Hill (+39). Via Stroud. Arrived +32.

08:18 Worcester Shrub Hill to London Paddington due 10:25 will be diverted between Worcester Shrub Hill and Reading.
This is due to a fault with the signalling system.
Last Updated:22/09/2025 08:17
Arrived +12.

08:56 Great Malvern to London Paddington due 11:27 will be started from Moreton-In-Marsh.
This is due to a fault with the signalling system.
Last Updated:22/09/2025 07:16

09:56 Great Malvern to London Paddington due 12:23 will be started from Oxford.
This is due to a fault with the signalling system.
Last Updated:22/09/2025 07:17

10:59 Great Malvern to London Paddington due 13:25 will be started from Oxford.
This is due to a fault with the signalling system.
Last Updated:22/09/2025 08:30

11:58 Great Malvern to London Paddington due 14:23 will be started from Moreton-In-Marsh.
This is due to a fault with the signalling system.
Last Updated:22/09/2025 09:13

13:16 Worcester Shrub Hill to London Paddington due 15:22 will be started from Moreton-In-Marsh.
This is due to a safety inspection of the track.
Last Updated:22/09/2025 10:35

13:18 Hereford to London Paddington due 16:24 will be started from Oxford.
This is due to a safety inspection of the track.
Last Updated:22/09/2025 10:28

15:18 Hereford to London Paddington due 18:29 will be started from Oxford.
This is due to a safety inspection of the track.
Last Updated:22/09/2025 09:25

05:53 London Paddington to Great Malvern due 08:38 will be terminated at Moreton-In-Marsh.
This is due to a fault with the signalling system.
Last Updated:22/09/2025 07:14

06:52 London Paddington to Great Malvern due 09:29 will be terminated at Oxford.
This is due to a fault with the signalling system.
Last Updated:22/09/2025 07:17

07:50 London Paddington to Great Malvern due 10:14 will be terminated at Oxford.
This is due to a fault with the signalling system.
Last Updated:22/09/2025 08:30

08:52 London Paddington to Great Malvern due 11:14 will be terminated at Moreton-In-Marsh.
This is due to a fault with the signalling system.
Last Updated:22/09/2025 09:13

09:52 London Paddington to Hereford due 12:46 will be terminated at Oxford.
This is due to a safety inspection of the track.
Last Updated:22/09/2025 10:28

10:53 London Paddington to Worcester Shrub Hill due 13:01 will be terminated at Moreton-In-Marsh.
This is due to a safety inspection of the track.
Last Updated:22/09/2025 10:35

11:52 London Paddington to Hereford due 14:44 will be terminated at Oxford.
This is due to a safety inspection of the track.
Last Updated:22/09/2025 09:25

Edits:
08:30 : updates added.
09:15 : more updates added.
10:15 : more updates added.
12:15 : disruption expected until 14:00.

Re: North Cotswold line delays and cancellations - 2025
Posted by Chris from Nailsea at 22:01, 21st September 2025
 
PBT? Post Brunel Technology. The railway always finds this tricky.

I shall add it to our Coffee Shop forum's 'abbreviations and acronyms' page, at https://www.firstgreatwestern.info/acronyms.html 

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 21:43, 21st September 2025
 
JourneyCheck's 'line updates':

Alterations to services between Great Malvern and Oxford via Worcester Shrub Hill
Following failure of the electricity supply between Oxford and Worcester Shrub Hill all lines have now reopened. Disruption is expected until the end of the day.
Train services between Great Malvern and Oxford via Worcester Shrub Hill and Moreton-In-Marsh may be delayed by up to 55 minutes or revised. Malvern Link, Great Malvern, Colwall, Ledbury, Hereford, London Paddington and Didcot Parkway will not be served.
Customer Advice
-
What has happened?
A power failure affected the signalling resulting in trains have to run a reduced speed on the North Cotswold Line earlier. Trains can now run at full speed but there are residual delays.
-
What are we doing about it?
We are having to terminate some trains short of their destination at Reading instead of Paddington and Worcester instead of Great Malvern. This is to ensure the next train runs on time.
[...]
Last Updated:21/09/2025 20:07

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 17:24, 21st September 2025
 
There was a powercut in Moreton overnight which I guess might have affected the signalbox in some way? But don't they have generators on stand-by?

There's a nice picture of this box at https://old.signalbox.org/gallery/w/moretoninmarsh.php, which tells me that the lever frame dates from 1911.

It's possible that the overnight power cut may have affected some of the new-fangled PBT electrical equipment. But the idea of this box having a standby generator may be very optimistic.

PBT? Post Brunel Technology. The railway always finds this tricky.

Re: North Cotswold line delays and cancellations - 2025
Posted by ChrisB at 16:27, 21st September 2025
 
There was a powercut in Moreton overnight which I guess might have affected the signalbox in some way? But don't they have generators on stand-by?

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 06:32, 21st September 2025
 
Sunday September 21

07:36 London Paddington to Great Malvern due 10:15 will be started from Reading and terminated at Oxford.
This is due to a shortage of train crew.
Last Updated:21/09/2025 06:18

An additional train service has been planned to operate as shown 10:00 Worcester Shrub Hill to Great Malvern due 10:15.
Last Updated:21/09/2025 06:23

This implies that a Sunday morning journey that lasts 2:39 has four different TMs, changing at Reading, Oxford and Shrub Hill.

Later (15:00), there are problems with the electricity supply:

13:13 Worcester Foregate Street to London Paddington due 15:26 will no longer call at Didcot Parkway and Reading.
It has been delayed between Evesham and Moreton-In-Marsh and is now 31 minutes late.
This is due to failure of the electricity supply.
Last Updated:21/09/2025 14:39
Delayed between Evesham (+3) and Moreton (+27). Oxford +36. Arrived +40.

13:58 Great Malvern to London Paddington due 16:26 is being delayed between Worcester Shrub Hill and Charlbury.
This is due to failure of the electricity supply.
Last Updated:21/09/2025 14:50
Held Shrub Hill (+14), delayed Evesham (+21) - Honeybourne (+30). Oxford +42, arrived Reading +37 and cancelled thereafter.

14:28 Hereford to London Paddington due 17:27 will be delayed between Worcester Shrub Hill and Charlbury.
This is due to failure of the electricity supply.
Last Updated:21/09/2025 14:50
Held Ledbury for 1W02 (+11) and Shrub Hill (+31). Charlbury +55. Arrived Reading +61 and cancelled thereafter.

16:58 Great Malvern to London Paddington due 19:27 will be started from Worcester Shrub Hill.
This is due to failure of the electricity supply.
Last Updated:21/09/2025 16:03
Held Norton (+19), Charlbury (+44), delayed Oxford (+59), arrived +61.

17:30 Hereford to London Paddington due 20:27 will be delayed between Worcester Shrub Hill and Charlbury.
This is due to failure of the electricity supply.
Last Updated:21/09/2025 17:55
No delay Shrub Hill - Charlbury. Held Charlbury (+28), arrived +35.

18:57 Great Malvern to London Paddington due 21:27 will be started from Worcester Shrub Hill.
It will be delayed between Worcester Shrub Hill and Charlbury.
This is due to failure of the electricity supply.
Last Updated:21/09/2025 17:55

19:58 Great Malvern to London Paddington due 22:27 will be delayed between Worcester Shrub Hill and Charlbury.
This is due to failure of the electricity supply.
Last Updated:21/09/2025 17:55

20:46 Great Malvern to London Paddington due 23:39 will be started from Worcester Shrub Hill.
This is due to failure of the electricity supply.
Last Updated:21/09/2025 19:26

1W02 11:45 London Paddington to Hereford (15:04) : Delayed between Moreton (+11) and Honeybourne (+23), saved 13 at Great Malvern and 6 at Ledbury, arrived +10.

12:45 London Paddington to Hereford due 16:04 is being delayed between Charlbury and Worcester Shrub Hill.
This is due to failure of the electricity supply.
Last Updated:21/09/2025 14:50
Delayed between Charlbury (+13) and Ascott (+25). Evesham +38. Saved 16 at Ledbury, arrived +34.

13:45 London Paddington to Great Malvern due 16:16 will be delayed between Charlbury and Worcester Shrub Hill.
This is due to failure of the electricity supply.
Last Updated:21/09/2025 14:50
Held Wolvercote (+11), delayed Charlbury (+15) - Ascott (+28). Held Evesham (+61). Arrived Shrub Hill +63 and cancelled thereafter.

14:45 London Paddington to Great Malvern due 17:16 will be delayed between Charlbury and Worcester Shrub Hill.
This is due to failure of the electricity supply.
Last Updated:21/09/2025 14:50
Held Wolvercote (+14), arrived Shrub Hill +43 and cancelled thereafter.

15:45 London Paddington to Great Malvern due 18:16 will be terminated at Worcester Shrub Hill.
This is due to failure of the electricity supply.
Last Updated:21/09/2025 17:55
Departed +33, Oxford +47, arrived Shrub Hill +71 and cancelled thereafter.

16:45 London Paddington to Great Malvern due 19:16 will be started from Reading.
This is due to failure of the electricity supply.
Last Updated:21/09/2025 16:03
Departed Reading +47, arrived Shruib Hill +62 and cancelled thereafter.

17:45 London Paddington to Great Malvern due 20:15 will be delayed between Charlbury and Worcester Shrub Hill.
This is due to failure of the electricity supply.
Last Updated:21/09/2025 17:55
Held Oxford (+35) and Evesham (+55), arrived Shrub Hill +59 and cancelled thereafter.

18:45 London Paddington to Hereford due 21:54 has been cancelled.
This is due to failure of the electricity supply.
Last Updated:21/09/2025 18:47

17:15 - more updates added.
18:15 - more updates added. The delays still haven't made it to JourneyCheck's 'Line Updates' section, which might give us an idea of when things will be restored.
21:55 - more updates added. The dalays have made it to JourneyCheck's 'Line Updates' section. "Disruption is expected until the end of the day."
Though the cancellation of the 18:45 from Paddington to Hereford means that tomorrow morning's 1P02 05:23 Hereford to London Paddington probably won't run.


Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 21:28, 20th September 2025
 
Saturday September 20

1W03 1650 London Paddington to Hereford : departed +23, arrived Great Malvern +25 and cancelled thereafter.

20:20 Hereford to London Paddington due 23:38 will be started from Great Malvern.
This is due to a fault on this train.
Last Updated:20/09/2025 19:04

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 15:29, 19th September 2025
 
1W02 1152 London Paddington to Hereford : departed +13, Reading +30, arrived Worcester Shrub Hill +36 and cancelled thereafter.

15:18 Hereford to London Paddington due 18:29 will be started from Worcester Shrub Hill.
This is due to train crew being delayed by service disruption.
Last Updated:19/09/2025 12:59

Re: North Cotswold line delays and cancellations - 2025
Posted by Witham Bobby at 14:38, 19th September 2025
 
15:23 London Paddington to Worcester Foregate Street due 17:47 will be cancelled.
This is due to a shortage of train crew.

Last Updated:19/09/2025 13:02

18:02 Worcester Foregate Street to London Paddington due 20:29 will be cancelled.
This is due to a shortage of train crew.
Further Information

Last Updated:19/09/2025 13:10

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 12:42, 19th September 2025
 
Friday September 19

Due to a broken down train at Ealing Broadway the Reading bound high speed line is blocked. Disruption is expected until 17:00 19/09.
Train services between London Paddington and Reading may be cancelled, delayed or revised.

09:52 London Paddington to Hereford due 12:46 will be terminated at Great Malvern.
It has been delayed at London Paddington and is now 30 minutes late.
This is due to a fault on a train in front of this one.
Last Updated:19/09/2025 11:33

13:18 Hereford to London Paddington due 16:24 will be started from Great Malvern.
This is due to a fault on a train in front of this one.
Last Updated:19/09/2025 11:33

13:30 : add

15:23 London Paddington to Worcester Foregate Street due 17:47 will be cancelled.
This is due to a shortage of train crew.
Last Updated:19/09/2025 13:02

18:02 Worcester Foregate Street to London Paddington due 20:29 will be cancelled.
This is due to a shortage of train crew.
Last Updated:19/09/2025 13:10

Re: North Cotswold line delays and cancellations - 2025
Posted by Richard Fairhurst at 07:13, 19th September 2025
 
Yesterday (Thursday) was a colossal mess.

1857 from Paddington to Great Malvern cancelled.

1953 from Paddington to Hereford set off 29 minutes late but then lost another 20 at Twyford. By Reading it was 61 minutes late. Looks like it eventually staggered into Hereford 92 minutes late.

I was at Oxford trying to get home. Eventually figured the S3 bus would be a better bet and it was - got home an hour later than I’d planned but that after a delicious meal in Oxford at a Chinese place I’ve wanted to try for ages. Even if Sichuan chicken followed by a Stagecoach double decker slaloming around the West Oxfordshire backroads was a risky decision…

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 15:24, 16th September 2025
 
Tuesday September 16

1W27 13:50 London Paddington to Great Malvern (16:15) : delayed at Oxford (+23), arrived Shrub Hill +21 and Worcester Foregate Street +38, cancelled thereafter.

16:32 Great Malvern to London Paddington due 19:29 will be started from Worcester Foregate Street.
This is due to passengers causing a disturbance on a train.
Last Updated:16/09/2025 15:47

15:52 London Paddington to Great Malvern due 18:26 will be terminated at Worcester Shrub Hill.
This is due to a shortage of train crew.
Last Updated:16/09/2025 13:46

19:02 Great Malvern to London Paddington due 21:26 will be cancelled.
This is due to a shortage of train crew.
Last Updated:16/09/2025 13:46

22:51 London Paddington to Worcestershire Parkway Hl due 01:06 will be cancelled.
This is due to a shortage of train crew.
Last Updated:16/09/2025 13:46

18:30 : 1W27/1P38 added
19:45 : Journeycheck text added for 16:32.

Re: North Cotswold line delays and cancellations - 2025
Posted by charles_uk at 14:30, 12th September 2025
 
13:50 London Paddington to Great Malvern due 16:15 will be cancelled.
This is due to a shortage of train crew.

16:32 Great Malvern to London Paddington due 19:29 will be cancelled.
This is due to a shortage of train crew.

18:02 Worcester Foregate Street to London Paddington due 20:29 will be terminated at Worcester Shrub Hill.
It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough, Oxford, Didcot Parkway, Reading and London Paddington.
This is due to a shortage of train crew.

18:57 London Paddington to Great Malvern due 21:18 will be terminated at Oxford.
It will no longer call at Hanborough, Charlbury, Kingham, Moreton-In-Marsh, Honeybourne, Evesham, Pershore, Worcestershire Parkway Hl, Worcester Shrub Hill, Worcester Foregate Street, Malvern Link and Great Malvern.
This is due to a shortage of train crew.

20:52 London Paddington to Great Malvern due 23:13 will be cancelled.
This is due to a shortage of train crew.

edit to add:

17:26 Worcester Foregate Street to London Paddington due 19:52 will call additionally at Hanborough.
This is due to the train making extra stops because a train was cancelled

(I've always thought it odd that this service misses out Hanborough given it's now one of the busiest intermediate stations on the line - presumably due to the Shipton stop and single line timings)

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 06:41, 11th September 2025
 
Thursday September 11

05:16 Worcester Shrub Hill to London Paddington due 07:24 has been delayed at Worcester Shrub Hill and is now 20 minutes late.
This is due to a late running freight train.
Will be formed of 5 coaches instead of 9.
Last Updated:11/09/2025 05:36
Departed +29. Arrived +21.

1P02 05:23 Hereford to London Paddington (08:24) : delayed Hereford - Ledbury (+22).

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 18:34, 10th September 2025
 
Wednesday September 10

15:18 Hereford to London Paddington due 18:29 will be terminated at Oxford.
It will no longer call at Didcot Parkway, Reading and London Paddington.
It has been delayed at Worcester Shrub Hill and is now 48 minutes late.
This is due to a fault on this train.
Last Updated:10/09/2025 17:09
Departed Hereford +51. Held Norton (+72) and Oxford North Jn (+76), arrived +79.

18:57 London Paddington to Great Malvern due 21:18 will be reinstated.
It will be started from Oxford.
It will no longer call at London Paddington and Reading.
This is due to a fault on this train.
Last Updated:10/09/2025 17:30

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 14:23, 9th September 2025
 
11:52 London Paddington to Hereford due 14:44 will be terminated at Great Malvern.
It has been delayed at London Paddington and is now 10 minutes late.
This is due to a broken down train earlier today.
Last Updated:09/09/2025 13:53
Departed +17, having arrived late from the depot. Arrived Great Malvern +29 (so just ahead of the WMR train) and cancelled thereafter.

15:18 Hereford to London Paddington due 18:29 will be started from Malvern Link.
This is due to a broken down train earlier today.
Last Updated:09/09/2025 13:53
Starting from Malvern Link must be a mistake - RTT reports that it started from Great Malvern.

1W25 1252 London Paddington to Worcester Foregate St : arrived Shrub Hill +17 and cancelled thereafter

15:18 Worcester Foregate Street to London Paddington due 17:29 will be started from Worcester Shrub Hill.
This is due to train crew being delayed.
Last Updated:09/09/2025 14:57

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 09:30, 9th September 2025
 
Tuesday September 9

Due to a broken down train between Moreton-In-Marsh and Worcester Shrub Hill the line towards Worcester Shrub Hill is blocked.
Train services running through these stations may be cancelled or delayed. Disruption is expected until 11:00 09/09.
Customer Advice
Due to a broken down Train on the Down Cotswold's at Evesham station Trains are unable to run from Moreton in Marsh towards Worcester Shrub Hill.
Last Updated:09/09/2025 09:03

2E77 0510 Oxford to Shrub Hill : arrived Evesham +65 and cancelled thereafter.

1W11 0553 London Paddington to Great Malvern : cancelled after arriving Moreton-in-Marsh (07:27)
2E80 0700 Worcester Shrub Hill to Didcot Parkway : started from Moreton (07:40) using the stock from 1W11.

08:56 Great Malvern to London Paddington due 11:27 will be started from Oxford.
This is due to a broken down train.
Last Updated:09/09/2025 07:49

09:56 Great Malvern to London Paddington due 12:23 will be started from Oxford.
This is due to a broken down train.
Last Updated:09/09/2025 07:37

10:59 Great Malvern to London Paddington due 13:25 will be started from Oxford.
This is due to a broken down train.
Last Updated:09/09/2025 09:57

06:52 London Paddington to Great Malvern due 09:29 will be terminated at Oxford.
This is due to a broken down train.
Last Updated:09/09/2025 07:35

07:50 London Paddington to Great Malvern due 10:14 will be terminated at Moreton-In-Marsh.
This is due to a broken down train.
Last Updated:09/09/2025 09:29

08:52 London Paddington to Great Malvern due 11:14 will be diverted between Didcot Parkway and Worcester Shrub Hill.
It will be delayed due to the diversion and is expected to be 25 minutes late.
This is due to a broken down train.
Last Updated:09/09/2025 08:28

09:52 London Paddington to Hereford due 12:46 will be diverted between Didcot Parkway and Worcester Shrub Hill.
It will be delayed due to the diversion and is expected to be 23 minutes late.
This is due to a broken down train.
Last Updated:09/09/2025 09:26
09:52 now reinstated.

At Evesham, nothing eastbound from 08:38 to 12:36, nothing westbound from start of service until 12:41 11:38.

09:33 : 09:52 to Hereford added.
10:22 : 10:59 from Great Malvern added.
11:06 : Broken-down train seems to have been moved back to Oxford. 09:52 to Hereford is now operating via Evesham, though there's no 'reinstated' note on JourneyCheck.


Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 12:28, 8th September 2025
 
Hereford is not having a good day:
09:52 London Paddington to Hereford due 12:46 has been cancelled.
This is due to a shortage of train crew.
Last Updated:08/09/2025 12:19

13:18 Hereford to London Paddington due 16:24 will be started from Worcester Shrub Hill.
This is due to a shortage of train crew.
Last Updated:08/09/2025 12:19

Re: North Cotswold line delays and cancellations - 2025
Posted by ChrisB at 09:44, 8th September 2025
 
I heard it was signal failure at Ledbury

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 07:16, 8th September 2025
 
Monday September 8

05:23 Hereford to London Paddington due 08:24 has been delayed at Hereford and is now 86 minutes late.
This is due to a fault with the signalling system.
Last Updated:08/09/2025 06:58

The problem looks as if it's on 'our' line - 1V17 0556 Worcester Shrub Hill to Hereford was cancelled after Great Malvern. But 1V18 0628 Worcester Shrub Hill to Hereford is currently waiting for the single line at Ledbury.

An update:
05:23 Hereford to London Paddington due 08:24 will be terminated at Worcester Shrub Hill.
It has been delayed at Hereford and is now 86 minutes late.
This is due to a fault with the signalling system.
Last Updated:08/09/2025 07:22
Arrived Shrub Hill 07:50 (+102).

And:
09:52 London Paddington to Hereford due 12:46 will be started from Worcester Shrub Hill.
This is due to a fault with the signalling system.
Last Updated:08/09/2025 07:49

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 05:10, 7th September 2025
 
Sunday September 7

Today we have engineering work with no GWR trains west of Worcester Parkway until 16:45.

07:36 London Paddington to Worcestershire Parkway Hl due 09:55 will be terminated at Oxford.
This is due to a fault on this train.
Last Updated:07/09/2025 00:43

10:21 Worcestershire Parkway Hl to London Paddington due 12:35 will be started from Oxford.
This is due to a fault on this train.
Last Updated:07/09/2025 00:44

13:47 London Paddington to Worcestershire Parkway Hl due 15:57 will be started from Reading.
This is due to earlier engineering works not being finished on time.
Last Updated:07/09/2025 10:11

I looked at RTT to see why this had happened. The 13:47 is formed by the stock from 1A80 08:10 Penzance to Paddington, due there at 13:24. Problems with an engineering train in West Cornwall meant that 1A80 departed Penzance +81. +73 at Exeter, but it then lost more time, arrived Reading at 14:29 (+100) and was cancelled thereafter. The 13:47 departed Reading at 14:46 (+29).

This didn't happen last Sunday (Aug 31) - the 08:10 from Penzance turned round and went back as the 13:59 to Penzance.

13:47 arrived Parkway +39.

Return, 1P69 16:21 Worcestershire Parkway to London Paddington (18:38) : departed +22.

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 09:30, 6th September 2025
 
Saturday September 6

05:52 London Paddington to Great Malvern due 08:18 has been delayed at Oxford and is now 20 minutes late.
This is due to a shortage of train crew.
Last Updated:06/09/2025 07:16
Arrived Foregate St +27 and cancelled thereafter.

08:50 Great Malvern to London Paddington due 11:24 will be started from Worcester Foregate Street.
This is due to a shortage of train crew.
Last Updated:06/09/2025 07:59

1W25 12:53 London Paddington to Worcester Foregate St (15:11) : arrived Shrub Hill +10 and cancelled thereafter.

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 06:34, 5th September 2025
 
Friday September 5

It's still broken:

05:10 Oxford to Worcester Shrub Hill due 06:15 will be cancelled.
This is due to a broken down train.
Last Updated:05/09/2025 04:00

07:00 Worcester Shrub Hill to Didcot Parkway due 08:46 will be started from Oxford.
This is due to a broken down train.
Last Updated:05/09/2025 04:00

07:13 Great Malvern to London Paddington due 09:42 will call additionally at Shipton, Ascott-Under-Wychwood, Finstock and Combe.
This is due to the train making extra stops because of service disruption.
Last Updated:05/09/2025 04:00

1W:34 1757 London Paddington to Worcester Foregate Street : delayed Paddington - Oxford (+13), held Wolvercote (+19) and Evesham (+35), arrived +39.

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 05:06, 4th September 2025
 
Thursday September 4

05:10 Oxford to Worcester Shrub Hill due 06:15 will be cancelled.
This is due to a broken down train.
Last Updated:04/09/2025 04:00

07:00 Worcester Shrub Hill to Didcot Parkway due 08:46 will be started from Oxford.
This is due to a broken down train.
Last Updated:04/09/2025 04:00

07:13 Great Malvern to London Paddington due 09:42 will call additionally at Shipton, Ascott-Under-Wychwood, Finstock and Combe.
Last Updated:04/09/2025 04:00

1W02 11:52 London Paddington to Hereford (14:44) : delayed at Parkway (+17), arrived +32.

15:18 Hereford to London Paddington due 18:29 will no longer call at Didcot Parkway.
It has been delayed at Hereford and is now 23 minutes late.
This is due to congestion.
Last Updated:04/09/2025 17:34
Departed +23, Oxford +20

16:58 London Paddington to Great Malvern due 19:25 has been delayed at London Paddington and is now 13 minutes late.
This is due to more trains than usual needing repairs at the same time.
Last Updated:04/09/2025 17:30

Re: North Cotswold line delays and cancell ations - 2025
Posted by Worcester_Passenger at 14:09, 3rd September 2025
 
Wednesday September 3

1W21 10:53 London Paddington to Worcester Shrub Hill (13:01) : arrived +28.

13:16 Worcester Shrub Hill to London Paddington due 15:22 will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham and Hanborough.
It will be starting late from Worcester Shrub Hill.
This is due to a fault on this train.
Last Updated:03/09/2025 12:42
Departed +23, arrived +14. Set 802 021.

1W02 11:52 London Paddington to Hereford (14:44) : held Evesham (+17, for 13:16 above), arrived Great Malvern +22 and cancelled therafter.

15:18 Hereford to London Paddington due 18:29 will be started from Great Malvern.
This is due to congestion.
Last Updated:03/09/2025 14:10

15:52 London Paddington to Great Malvern due 18:26 will be terminated at Moreton-In-Marsh.
This is due to a fault on this train.
Last Updated:03/09/2025 17:13
Set 802 021. Arrived Moreton +20.

19:02 Great Malvern to London Paddington due 21:26 will be cancelled.
This is due to a fault on this train.
Last Updated:03/09/2025 17:13

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 03:05, 2nd September 2025
 
Tuesday September 2

06:43 Worcester Shrub Hill to London Paddington due 08:44 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
Last Updated:02/09/2025 02:00

And something went wrong with the morning 'halts' train:

2E80 07:00 Shrub Hill to Didcot Parkway was started from Oxford "due to a problem with the train (M8)" [RTT].

The stock ran in service from Oxford to Shrub Hill, but went back ECS.

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 06:03, 1st September 2025
 
Monday September 1

07:13 Great Malvern to London Paddington due 09:42 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
Last Updated:01/09/2025 00:08

1W31 15:52 London Paddington to Great Malvern (18:26) : cancelled after Oxford.

19:02 Great Malvern to London Paddington due 21:26 will be started from Oxford.
This is due to a fault on this train.
Last Updated:01/09/2025 16:53

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 09:19, 31st August 2025
 
Sunday August 31

07:36 London Paddington to Great Malvern due 10:15 will no longer call at Hanborough, Charlbury, Kingham, Moreton-In-Marsh, Honeybourne, Evesham, Pershore and Worcestershire Parkway Hl.
It is being delayed at London Paddington.
This is due to this train being late from the depot.
Will be formed of 5 coaches instead of 9.
Last Updated:31/08/2025 08:01
Departed +28, Reading +19, Oxford +20, held Shrub Hill, arrived +19.

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 15:30, 30th August 2025
 
Saturday August 30

Signalling problems at Didcot, and plastic sheeting in the overhead wires at Southall.

1W25 12:53 London Paddington to Worcester Foregate St (15:11) : delayed at Didcot (+18), arrived Shrub Hill +19 and cancelled thereafter.

14:52 London Paddington to Great Malvern due 17:14 will be terminated at Worcester Foregate Street.
It has been delayed between London Paddington and Reading and is now 38 minutes late.
This is due to an object being caught on the overhead electric wires earlier today.
Last Updated:30/08/2025 17:09

15:52 London Paddington to Great Malvern due 18:29 is being delayed at London Paddington.
This is due to an object being caught on the overhead electric wires.
Last Updated:30/08/2025 16:55
Departed +24, held Woivercote (+34) and Evesham (+54), arrived Shrub Hill +57 and cancelled thereafter.

1P25 13:05 Worcester Foregate Street to London Paddington (15:22) : held Charlbury (+11), arrived +40.

1P37 19:00 Great Malvern to London Paddington (21:23) : started from Shrub Hill.

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 06:42, 29th August 2025
 
Friday August 29

11:52 London Paddington to Hereford due 14:44 will be terminated at Worcester Shrub Hill.
This is due to a shortage of train crew.
Last Updated:29/08/2025 02:25

15:18 Hereford to London Paddington due 18:29 will be started from Worcester Shrub Hill.
This is due to a shortage of train crew.
Last Updated:29/08/2025 02:25

Both operated to and from Hereford - there must have been a 'reinstated' message that I missed.

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 14:33, 28th August 2025
 
Thursday August 28

1W02 11:52 London Paddington to Hereford due 14:44 will be terminated at Great Malvern.
It has been delayed between Oxford and Evesham and is now 31 minutes late.
This is due to a speed restriction over defective track.
Last Updated:28/08/2025 14:09
Charlbury +11, Ascott +20, Moreton +29, arrived Great Malvern +39.

14:53 London Paddington to Worcester Foregate Street due 17:04 will be terminated at Worcester Shrub Hill.
It has been delayed between London Paddington and Reading and is now 17 minutes late.
This is due to a late running train being in front of this one.
Last Updated:28/08/2025 16:42
Arrived Shrub Hill +32.

1W30 15:23 London Paddington to Worcester Foregate St (17:47) : Reading +10, Oxford +19, held Evesham (+43), arrived Shrub Hill +46 and cancelled thereafter.
1W31 15:52 London Paddington to Great Malvern (18:26) : Charlbury +8, Ascott +17, held Evesham (+28), arrived +31.
1W34 17:57 London Paddington to Worcester Foregate Street (20:11) : held Evesham (+21), arrived +21.

15:18 Hereford to London Paddington due 18:29 will be started from Great Malvern.
This is due to a speed restriction over defective track.
Last Updated:28/08/2025 14:09

17:26 Worcester Foregate Street to London Paddington due 19:52 will be started from Worcester Shrub Hill.
This is due to a late running train being in front of this one.
Last Updated:28/08/2025 16:42

18:02 Worcester Foregate Street to London Paddington due 20:29 will be started from Worcester Shrub Hill.
This is due to a late running train being in front of this one.
Last Updated:28/08/2025 17:47
Departed +20.

1P42 19:02 Great Malvern to London Paddington (21:26) : departed +20, held Henwick (+29), arrived +30.

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 21:23, 27th August 2025
 
Following a safety inspection of the track at Honeybourne the line towards Oxford has now reopened. Disruption is expected until the end of the day.
Train services between Worcester Shrub Hill and Oxford are returning to normal but some services may still be cancelled, delayed or diverted. Evesham, Pershore, Moreton-In-Marsh, Kingham, Charlbury and Hanborough will not be served.
Customer Advice
A section of track near Honeybourne is closed for a safety inspection. Unfortunately this means we are currently unable to run our service between Worcester and Oxford. We are currently arranging plans for customers affected on the route. In some cases it may be possible to divert trains between Worcester Shrub Hill and Reading, but stations along the way will not be served. On board staff will inform customers of the route they will take, and potential journey times.
Last Updated:27/08/2025 20:48

Final scores:

1P38 16:32 Great Malvern to London Paddington (19:29) : held Honeybourne (+174), saved 16 at Moreton, arrived Oxford +156 and cancelled thereafter.
1P39 17:26 Worcester Foregate Street to Paddington (19:52) : cancelled after Worcester Shrub Hill.
1P40 18:02 Foregate Street to London Paddington (20:29) : started from Shrub Hill, operated via Stroud, arrived +26.
2E16 19:10 Evesham to Oxford (19:50) : started from Moreton-in-Marsh.
1P42 19:02 Great Malvern to London Paddington (21:26) : operated via Stroud, arrived +52.
1P44 19:45 Great Malvern to London Paddington due 22:24 : started from Oxford, delayed after Slough, arrived +39.
1P46 20:56 Worcester Foregate Street to London Paddington due 23:29 : started from Oxford, delayed after Slough, arrived +41.
1P06 22:00 Hereford to London Paddington (01:15) : first train through affected section, held Reading, arrived +16.

1W30 15:23 London Paddington to Worcester Foregate Street (17:47) : delayed before Worcester, arrived Shrub Hill +24 and cancelled thereafter.
1W31 15:52 London Paddington to Great Malvern : OK
2E14 17:04 Didcot to Evesham : started from Oxford (+13), arrived Moreton-in-Marsh +11 and cancelled thereafter.
1W33 16:58 London Paddington to Great Malvern (19:25) : held Oxford (+24), arrived Moreton-in-Marsh +23 and cancelled thereafter.
1W03 17:34 London Paddington to Hereford : arrived +22.
1W34 17:57 London Paddington to Foregate Street : cancelled after Oxford
1W36 18:57 London Paddington to Great Malvern due 21:18 was terminated at Oxford.
1W05 19:53 London Paddington to Hereford (22:57) : OK
1W41 20:52 London Paddington to Great Malvern due 23:13 : cancelled throughout.

[Aug 28 09:00 : tidied up with 'final scores'.]

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 17:49, 27th August 2025
 
Wednesday August 27

Unreported on JourneyCheck, RTT is saying that
1P39 1726 Worcester Foregate Street to Worcester Shrub Hill
was cancelled after Shrub Hill "due to a problem with the track (IS)".

and 1W31 1552 London Paddington to Great Malvern was held at Moreton (+13).

Now being reported on JourneyCheck:
Due to a safety inspection of the track at Honeybourne the line towards Oxford is blocked. Disruption is expected until the end of the day.
Train services between Worcester Shrub Hill and Oxford may be cancelled, delayed or diverted.
Customer Advice
A section of track near Homeybourne is closed for a safety inspection. Unfortunately this means we are currently unable to run our service between Worcester and Oxford. We are currently arranging plans for customers affected on the route. In some cases it may be possible to divert trains between Worcester Shrub Hill and Reading, but stations along the way will not be served. On board staff will inform customers of the route they will take, and potential journey times.
Last Updated:27/08/2025 17:56

Latest scores:
16:32 Great Malvern to London Paddington due 19:29 will no longer call at Didcot Parkway but will call additionally at Radley.
It is being delayed at Honeybourne.
This is due to a safety inspection of the track.
Last Updated:27/08/2025 17:40
Currently held at Honeybourne (+42).

17:26 Worcester Foregate Street to London Paddington due 19:52 was terminated at Worcester Shrub Hill.
This is due to a safety inspection of the track.
Last Updated:27/08/2025 17:38
18:02 Worcester Foregate Street to London Paddington due 20:29 will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough and Oxford.
It will be delayed between Worcester Shrub Hill and Didcot Parkway.
This is due to a safety inspection of the track.
Last Updated:27/08/2025 17:58
Being sent via Stroud. Currently held at Abbotswood Junction.

18:51 Evesham to Oxford due 19:50 will be reinstated.
It will be started from Moreton-In-Marsh.
This is due to a safety inspection of the track.
Last Updated:27/08/2025 17:33

16:58 London Paddington to Great Malvern due 19:25 is being delayed at Oxford.
This is due to a safety inspection of the track.
Last Updated:27/08/2025 17:56[/quote]
RTT showing as terminating at Moreton. Departed Oxford +24.

1W03 1734 London Paddington to Hereford is operating via Oxford.

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 21:18, 25th August 2025
 
Bank Holiday Monday August 25

First day of service after seven days of closure.

Following a fault with the signalling system at Evesham all lines have now reopened. Disruption is expected until the end of the day.
Train services between Oxford and Worcester Shrub Hill are returning to normal but some services may still be cancelled or delayed.
Customer Advice
Following a signal fault at Evesham, trains are able to run normally once again. However, this has caused some significant disruption on the route, and so delays can be expected for the rest of the day.
Last Updated:25/08/2025 20:58

Final scores:

1W30 15:23 London Paddington to Worcester Foregate Street (17:47) : held Evesham (+67), arrived +71.
1W31 15:52 London Paddington to Great Malvern : delayed at Ladbroke Grove (+17), held Moreton (+68), arrived Worcester Shrub Hill +118 and cancelled thereafter.
2E14 17:04 Didcot Parkway to Evesham (18:23) : delayed Ascott (+46), arrived Moreton-in-Marsh +45 and cancelled thereafter.
1W03 17:34 London Paddington to Hereford (20:25) : held Honeybourne (+31) and Evesham (+52), arrived Worcester Shrub Hill +54 and cancelled thereafter.
1W34 17:57 London Paddington to Worcester Foregate Street (20:11) : held Moreton (+19), Evesham (+32), arrived +38.
1W36 18:57 London Paddington to Great Malvern : departed +17, arrived Reading +20 and cancelled thereafter.
1W05 19:53 London Paddington to Hereford (22:57) : held Oxford (+45) and Wolvercote (+51), saved 14 at Great Malvern (+51), arrived +57.
1W41 20:52 London Paddington to Great Malvern (23:13) : delayed Oxford (+9), arrived +17.
1W43 21:53 London Paddington to Worcester Shrub Hill (00:01) : cancelled throughout.
1W45 23:32 London Paddington to Worcestershire Parkway (01:06) : started from Reading.

1P38 16:32 Great Malvern to Paddington (19:29) : arrived Worcester Shrub Hill +8 and cancelled thereafter.
1P39 17:26 Worcester Foregate Street to London Paddington (19:52) : held Shrub Hill (+61), Norton (+103), saved 10 at Moreton, arrived +90.
1P40 18:02 Worcester Foregate Street to London Paddington (20:29) : departed +79, held Shrub Hill (+90), operated via Stroud, arrived +71.
2E16 18:51 Evesham to Oxford (19:50) : started from Moreton-in-Marsh
1P42 19:02 Great Malvern to London Paddington : started from Worcester Shrub Hill (+50), held Norton (+66), arrived Reading +77 and cancelled thereafter.
1P44 19:45 Great Malvern to London Paddington (22:24) : started from Oxford (+19), arrived +18.
1P06 22:00 Hereford to London Paddington (01:15) : started from Worcester Shrub Hill

Aug 26 05:00 : "latest scores" replaced by "final scores".

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 18:32, 24th August 2025
 
.. and a late addition:
16:50 London Paddington to Moreton-In-Marsh due 18:22 has been cancelled.
This is due to a shortage of train crew.
Last Updated:24/08/2025 17:27

The gap in the service now has nothing westward from Oxford from 16:47 until the last train at 21:46 (and a similar gap at Moreton).

Re: North Cotswold line delays and cancellations - 2025
Posted by Richard Fairhurst at 16:14, 24th August 2025
 
Yikes. With the Big Feastival finishing today in Kingham that could get messy.

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 05:20, 24th August 2025
 
Sunday August 24

Advance warnings of disruptions this evening:

16:50 London Paddington to Moreton-In-Marsh due 18:22 will be started from Oxford.
This is due to a shortage of train crew.
Last Updated:24/08/2025 01:18

17:50 London Paddington to Moreton-In-Marsh due 19:22 will be terminated at Oxford.
This is due to a shortage of train crew.
Last Updated:24/08/2025 01:18

18:50 London Paddington to Moreton-In-Marsh due 20:22 will be started from Oxford.
This is due to a shortage of train crew.
Last Updated:23/08/2025 23:28

19:50 London Paddington to Moreton-In-Marsh due 21:22 will be terminated at Oxford.
This is due to a shortage of train crew.
Last Updated:24/08/2025 01:20

19:54 Moreton-In-Marsh to London Paddington due 21:24 will be terminated at Oxford.
This is due to a shortage of train crew.
Last Updated:23/08/2025 23:28

20:54 Moreton-In-Marsh to London Paddington due 22:24 will be terminated at Oxford.
This is due to a shortage of train crew.
Last Updated:23/08/2025 23:35

21:48 Moreton-In-Marsh to London Paddington due 23:41 will be started from Oxford.
This is due to a shortage of train crew.
Last Updated:24/08/2025 01:20

10:50 : These have been updated:
16:50 London Paddington to Moreton-In-Marsh due 18:22 will be started from Oxford.
This is due to a shortage of train crew.
Last Updated:24/08/2025 10:28

17:50 London Paddington to Moreton-In-Marsh due 19:22 will be cancelled.
This is due to a shortage of train crew.
Last Updated:24/08/2025 10:28

18:50 London Paddington to Moreton-In-Marsh due 20:22 will be cancelled.
This is due to a shortage of train crew.
Last Updated:24/08/2025 10:29

19:50 London Paddington to Moreton-In-Marsh due 21:22 will be terminated at Oxford.
This is due to a shortage of train crew.
Last Updated:24/08/2025 01:20

19:54 Moreton-In-Marsh to London Paddington due 21:24 will be cancelled.
This is due to a shortage of train crew.
Last Updated:24/08/2025 10:29

20:54 Moreton-In-Marsh to London Paddington due 22:24 will be cancelled.
This is due to a shortage of train crew.
Last Updated:24/08/2025 10:29

21:48 Moreton-In-Marsh to London Paddington due 23:41 will be started from Oxford.
This is due to a shortage of train crew.
Last Updated:24/08/2025 01:20

This leaves a huge gap in the service - nothing westward from Oxford from 17:45 until the last train at 21:46 (and a similar gap at Moreton).

Re: North Cotswold line delays and cancellations - 2025
Posted by ChrisB at 13:13, 23rd August 2025
 
Saturday August 23

Later - curiouser and curiouser:
11:58 Worcester Shrub Hill to Hereford due 12:43 will no longer call at Ledbury.
This is due to a fault on this train.
Will be formed of 2 coaches instead of 9. There are no reservations on this service.
Additional Facilities Information
first class ONLY on this train - NO STANDARD CLASS AVAILABLE.
Last Updated:23/08/2025 10:31
Though RTT is reporting this as being a 9-car train.

So only the 1st class coaches in use with all the Standard locked out, it seems. Can't think why they'd do that though. And why that prevents a call at Ledbury....

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 10:15, 23rd August 2025
 
Saturday August 23

A curious one this morning:
11:58 Worcester Shrub Hill to Hereford due 12:43 will no longer call at Ledbury.
This is due to a fault on this train.
Last Updated:23/08/2025 09:20

Later - curiouser and curiouser:
11:58 Worcester Shrub Hill to Hereford due 12:43 will no longer call at Ledbury.
This is due to a fault on this train.
Will be formed of 2 coaches instead of 9. There are no reservations on this service.
Additional Facilities Information
first class ONLY on this train - NO STANDARD CLASS AVAILABLE.
Last Updated:23/08/2025 10:31
Though RTT is reporting this as being a 9-car train.

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 07:53, 22nd August 2025
 
Friday August 22

Cancellations to the Worcester - Malvern shuttles:
06:32 Swindon to Worcester Shrub Hill due 07:58 has been cancelled.
This is due to more trains than usual needing repairs at the same time.
Last Updated:22/08/2025 07:01

08:23 Worcester Shrub Hill to Great Malvern due 08:38 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
Last Updated:22/08/2025 07:01

08:56 Great Malvern to Worcester Shrub Hill due 09:12 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
Last Updated:22/08/2025 07:01

09:59 Worcester Shrub Hill to Great Malvern due 10:14 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
Last Updated:22/08/2025 07:01

10:59 Great Malvern to Worcester Shrub Hill due 11:15 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
Last Updated:22/08/2025 07:01

and

11:52 London Paddington to Moreton-In-Marsh due 13:19 will be reinstated.
It will be terminated at Oxford.
This is due to a shortage of train crew.
Last Updated:22/08/2025 11:21

20:52 London Paddington to Moreton-In-Marsh due 22:19 will be cancelled.
This is due to a shortage of train crew.
Last Updated:22/08/2025 01:12

22:18 London Paddington to Moreton-In-Marsh due 23:49 will be cancelled.
This is due to a shortage of train crew.
Last Updated:22/08/2025 09:24

13:53 Moreton-In-Marsh to London Paddington due 15:22 will be reinstated.
It will be started from Oxford.
This is due to a shortage of train crew.
Last Updated:22/08/2025 11:22

22:44 Moreton-In-Marsh to London Paddington due 00:45 will be cancelled.
This is due to a shortage of train crew.
Last Updated:22/08/2025 01:16

23/08/25 00:35 Moreton-In-Marsh to Oxford due 01:13 will be cancelled.
This is due to a shortage of train crew.
Last Updated:22/08/2025 09:29

11:30 : Updated for cancellations.

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 22:09, 21st August 2025
 
Later (22:00):
20:53 Moreton-In-Marsh to London Paddington due 22:24 will be terminated at Reading.
This is due to a shortage of train crew.
Last Updated:21/08/2025 13:24

21:45 Moreton-In-Marsh to London Paddington due 23:29 will be terminated at Oxford.
This is due to a shortage of train crew.
Last Updated:21/08/2025 18:08
Train has departed Oxford on time. Arrived Paddington -5.

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 14:17, 21st August 2025
 
More (14:15):
16:58 London Paddington to Moreton-In-Marsh due 18:26 will be cancelled.
This is due to a shortage of train crew.
Last Updated:21/08/2025 13:27

22:18 London Paddington to Moreton-In-Marsh due 23:49 will be terminated at Oxford.
This is due to a shortage of train crew.
Last Updated:21/08/2025 13:06

18:48 Moreton-In-Marsh to London Paddington due 20:29 will be cancelled.
This is due to a shortage of train crew.
Last Updated:21/08/2025 13:27

21:45 Moreton-In-Marsh to London Paddington due 23:29 will be started from Oxford.
This is due to a shortage of train crew.
Last Updated:21/08/2025 02:01

22/08/25 00:35 Moreton-In-Marsh to Oxford due 01:14 will be cancelled.
This is due to a shortage of train crew.
Last Updated:21/08/2025 13:07

Re: North Cotswold line delays and cancellations - 2025
Posted by Witham Bobby at 14:01, 21st August 2025
 
It's a bit weird that the absence of service (other than the rail replacement buses) between Worcester and Moreton in Marsh does not get a mention on GW Journeycheck

I just had a look, and there's nothing there.  I'd have expected that the closure and bus replacements would have been mentioned in the "Improvement Works" section

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 11:51, 21st August 2025
 
Thursday August 21

11:52 London Paddington to Moreton-In-Marsh due 13:19 will be cancelled.
This is due to a shortage of train crew.
Last Updated:21/08/2025 10:04

13:53 Moreton-In-Marsh to London Paddington due 15:22 will be cancelled.
This is due to a shortage of train crew.
Last Updated:21/08/2025 10:04

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 08:41, 20th August 2025
 
Wednesday's disruption continues into this morning's early journeys:
05:23 Hereford to London Paddington due 08:16 will be cancelled.
This is due to the emergency services dealing with an incident earlier today.
Last Updated:20/08/2025 01:10

09:52 London Paddington to Moreton-In-Marsh due 11:21 will be started from Oxford.
This is due to a shortage of train crew.
Last Updated:20/08/2025 03:55

Later (10:30):
09:52 London Paddington to Moreton-In-Marsh due 11:21 will be cancelled.
This is due to a shortage of train crew.
Last Updated:20/08/2025 09:19

11:54 Moreton-In-Marsh to London Paddington due 13:25 will be cancelled.
This is due to a shortage of train crew.
Last Updated:20/08/2025 09:19

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 15:55, 19th August 2025
 
Monday August 18

Line closed for track work between Moreton and Shrub Hill, reopening on Monday August 25.
Two morning up trains via Stroud, one from Hereford and one from Shrub Hill. Two evening down trains likewise, both to Hereford.

Tuesday August 29

Emergency services dealing with an incident at Didcot.
14:53 Moreton-In-Marsh to London Paddington due 16:24 will no longer call at Didcot Parkway.
It is being delayed between Oxford and Didcot Parkway.
This is due to the emergency services dealing with an incident.
Last Updated:19/08/2025 15:36
Held Charlbury (+29), arrived +40.

15:53 Moreton-In-Marsh to London Paddington due 17:29 will no longer call at Didcot Parkway.
It will be delayed between Oxford and Didcot Parkway.
This is due to the emergency services dealing with an incident.
Last Updated:19/08/2025 15:36

16:53 Moreton-In-Marsh to London Paddington due 18:29 will be cancelled.
This is due to the emergency services dealing with an incident.
Last Updated:19/08/2025 16:14

14:53 London Paddington to Moreton-In-Marsh due 16:20 is being delayed at Reading.
This is due to the emergency services dealing with an incident.
Last Updated:19/08/2025 15:39
16:15 : Cancelled after Reading.

15:52 London Paddington to Moreton-In-Marsh due 17:20 will be starting late from London Paddington.
This is due to the emergency services dealing with an incident.
Last Updated:19/08/2025 15:27

16:58 London Paddington to Moreton-In-Marsh due 18:26 will be starting late from London Paddington.
This is due to the emergency services dealing with an incident.
Last Updated:19/08/2025 16:29

17:30 London Paddington to Hereford due 20:25 will be starting late from London Paddington.
This is due to the emergency services dealing with an incident.
Last Updated:19/08/2025 16:29
Later (17:48) : cancelled throughout.

The disruption continued into the evning, with
19:36 London Paddington to Hereford due 22:57 will be cancelled.
This is due to the emergency services dealing with an incident.
Last Updated:19/08/2025 18:46

20:53 Moreton-In-Marsh to London Paddington due 22:24 will be cancelled.
This is due to the emergency services dealing with an incident.
Last Updated:19/08/2025 19:08

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 10:08, 17th August 2025
 
Saturday August 16 was a good day.

Sunday August 17

08:57 Great Malvern to London Paddington due 11:24 will be cancelled.
This is due to a fault on this train.
Last Updated:16/08/2025 22:27
Stock ran empty to Paddington and from there to North Pole.

Later (13:00):
12:50 London Paddington to Hereford due 16:04 will be terminated at Reading.
This is due to a shortage of train crew.
Last Updated:17/08/2025 10:43

An additional train service has been planned to operate as shown 15:01 Worcester Shrub Hill to Hereford due 16:04.
Last Updated:17/08/2025 10:44

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 03:38, 16th August 2025
 
The problems with the track caused a huge amount of disruption:

1W01 09:52 London Paddington to Hereford (12:46) : cancelled after Worcester Shrub Hill due to a points problem.
1W02 11:52 London Paddington to Hereford (14:44) : held Moreton (+17), Shrub Hill (+33), arrived Great Malvern +37 and cancelled thereafter.
1W25 12:52 London Paddington to Worcester Foregate Street : held Evesham (+15), arrived +15.
1W27 13:50 London Paddington to Great Malvern (16:15) : held Evesham (+13), arrived +17.
1W29 14:53 London Paddington to Foregate Street (17:04) : departed Moreton +14, arrived Evesham +88, arrived Worcester Shrub Hill +91 and cancelled thereafter.
1W30 15:23 London Paddington to Foregate Street (17:47) : cancelled after Oxford.
1W31 15:52 London Paddington to Great Malvern (18:26) : departed Charlbury +19, passed Ascott +46, saved 13 stand at Evesham, arrived Worcester Foregate Street +54 and cancelled thereafter.
2E14 17:04 Didcot to Evesham : started from Oxford (+19), arrived +33.
1W33 16:58 London Paddington to Great Malvern (19:25) : cancelled throughout.
1W03 17:34 London Paddington to Hereford (20:25) : held Moreton +25, Evesham (+32), arrived +31.
1W34 17:57 London Paddington to Worcester Foregate Street (20:11) : cancelled throughout.
1W36 18:57 London Paddington to Great Malvern (21:18) : cancelled throughout.
1W05 19:53 London Paddington to Hereford (22:57) : OK.

1P28 11:58 Great Malvern to London Paddington (14:23) : departed Evesham +5, passed Ascott +18, arrived +18.
1P04 13:18 Hereford to London Paddington (16:24) : started from Shrub Hill.
1P05 15:18 Hereford to Paddington (18:29) : started from Great Malvern, cancelled after Worcester Shrub Hill.
1P38 16:32 Great Malvern to London Paddington (19:29) : departed +16, ran via Stroud.
1P39 17:26 Foregate St to London Paddington (19:52) : started from Shrub Hill (+67), held Norton (+81), saved 10 at Moreton, arrived +46.
1P40 18:02 Foregate Street to London Paddington : started from Oxford.
2E16 18:51 Evesham to Oxford : departed +29, arrived +31.
1P42 19:02 Great Malvern  to London Paddington (21:26) : started from Foregate Street
1P44 19:45 Great Malvern to London Paddington (22:24) : cancelled throughout.
1P46 20:56 Worcester Foregate Street to London Paddington (23:29) : cancelled throughout.

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 14:31, 15th August 2025
 
11:52 London Paddington to Hereford due 14:44 will be terminated at Great Malvern.
It has been delayed at Honeybourne and is now 17 minutes late.
This is due to a safety inspection of the track.
Last Updated:15/08/2025 14:10
Train held Shrub Hill (+33), arrived Great Malvern +37 and cancelled thereafter.

12:52 London Paddington to Worcester Foregate Street due 15:00 will be delayed at Honeybourne.
This is due to a safety inspection of the track.
Last Updated:15/08/2025 13:51

11:58 Great Malvern to London Paddington due 14:23 has been delayed at Charlbury and is now 18 minutes late.
This is due to a safety inspection of the track.
Last Updated:15/08/2025 13:53

15:18 Hereford to London Paddington due 18:29 will be started from Great Malvern.
It will no longer call at Hereford, Ledbury and Colwall.
This is due to a safety inspection of the track.
Last Updated:15/08/2025 14:10

Re: North Cotswold line delays and cancellations - 2025
Posted by ChrisB at 14:06, 15th August 2025
 
Points failure close to Hereford

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 12:45, 15th August 2025
 
Friday August 15

09:52 London Paddington to Hereford due 12:46 was terminated at Worcester Shrub Hill.
This is due to a points failure.
Last Updated:15/08/2025 12:17

13:18 Hereford to London Paddington due 16:24 will be started from Worcester Shrub Hill.
This is due to a points failure.
Last Updated:15/08/2025 12:17

Re: North Cotswold line delays and cancellations - 2025
Posted by Richard Fairhurst at 14:32, 13th August 2025
 
It ran as normal to Oxford, but then non-stop from there to Shrub Hill... or at least that's what was announced and shown on the boards at Oxford. Looking at RTT, it seems to have lost 7 or so minutes at Wolvercot waiting for the single line, but then clawed back 20 by not stopping until Shrub Hill.

(Yes, I was waiting for it at Oxford and trying to get back to Charlbury, mutter mutter.)

https://www.realtimetrains.co.uk/service/gb-nr:P08644/2025-08-13/detailed#allox_id=0

Re: North Cotswold line delays and cancellations - 2025
Posted by Witham Bobby at 12:40, 13th August 2025
 
1W21 1053 Padd - Shrub Hill is reported on RTT to be cancelled due to a problem with the doors.  But the same site is showing it as running, but 33 minutes late at present (at Charlbury)

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 12:28, 13th August 2025
 
Wednesday August 13

1P11 05:16 Worcester Shrub Hill to London Paddington (07:24) departed +59 and may have skipped stops, arrived +47.

10:53 London Paddington to Worcester Shrub Hill due 13:01 will no longer call at Hanborough, Charlbury, Kingham, Moreton-In-Marsh, Honeybourne, Evesham, Pershore and Worcestershire Parkway Hl.
It has been delayed at London Paddington and is now 32 minutes late.
This is due to a fault on this train.
Last Updated:13/08/2025 12:17

11:52 London Paddington to Hereford due 14:44 will be starting late from London Paddington.
This is due to this train being late from the depot.
Last Updated:13/08/2025 11:31
Seems to be running to time.

Re: North Cotswold line delays and cancellations - 2025
Posted by Chris from Nailsea at 21:06, 8th August 2025
 
Happy to have this post moved if it's really out of place here

I'm comfortable with it remaining here, in terms of continuity and wider context.

Re: North Cotswold line delays and cancellations - 2025
Posted by Witham Bobby at 10:00, 8th August 2025
 
I know this is one for the Kemble and Swindon route across The Cotswolds, but, for the record:

07:25 Worcester Shrub Hill to London Paddington due 09:59 will be cancelled.
This is due to a fault on this train.
Last Updated:08/08/2025 02:48

Happy to have this post moved if it's really out of place here

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 11:14, 5th August 2025
 
Tuesday August 5

10:59 Great Malvern to London Paddington due 13:25 will be starting late from Great Malvern.
This is due to a points failure.
Last Updated:05/08/2025 08:05
Looks to be on time according to RTT.

10:53 London Paddington to Worcester Shrub Hill due 13:01 will be cancelled.
This is due to a fault on this train.
Last Updated:05/08/2025 09:50

13:16 Worcester Shrub Hill to London Paddington due 15:22 will be cancelled.
This is due to a fault on this train.
Last Updated:05/08/2025 09:50

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 11:01, 5th August 2025
 
A safety inspection caused some disruption later on:

1W02 1152 London Paddington to Hereford : departed +33, arrived Worcester Shrub Hill +25, cancelled thereafter.
1W25 1252 London Paddington to Worcester Foregate Street : arrived Shrub Hill +16, foregate St +24
1W27 1350 London Paddington to Great Malvern : held Evesham (+19), arrived Shrub Hill +25 and cancelled thereafter..
1W29 1453 London Paddington to Foregate St : held Evesham (+29), arrived Worcester Shrub Hill +25 and cancelled thereafter
1W30 1523 London Paddington to Foregate St : held Evesham (+37), arrived Worcester Shrub Hill +36 and cancelled thereafter.
1W31 1552 London Paddington to Great Malvern : held Evesham (+34), arrived Worcester Shrub Hill +34 and cancelled thereafter.
1W03 1734 London Paddington to Hereford : held Wolvercote (+20), Evesham (+29), arrived +25.
1W34 1757 London Paddington to Worcester Foregate Street : departed +14, arrived +15.

1P34 1518 Worcester Foregate Street to London Paddington : departed +14, eld Charlbury (+27), arrived +32.
1P05 1518 Hereford to London Paddington : started from Worcester Shrub Hill (+11), held Norton (+15)
1P38 1632 Great Malvern to London Paddington : started from Worcester Shrub Hill, held Norton (+25), arrived Evesham +42, saved 16 at Moreton, arrived +22.
1P39 1726 Foregate St  to London Paddington : started from Worcester Shrub Hill, held Norton (+35), saved 10 at Moreton, delayed Didcot (+41), arrived +39.
1P40 1802 Foregate St to London Paddington : started from Worcester Shrub Hill (+14), ran via Stroud.
1P42 1902 Great Malvern to London Paddington : started from Worcester Shrub Hill


Re: North Cotswold line delays and cancellations - 2025
Posted by ChrisB at 12:12, 4th August 2025
 
A bunch of extra trains in the timetable for Wilderness Festival returnees tomorrow:

  • 0943 Charlbury-Paddington
  • 1037 Charlbury-Paddington
  • 1138 Charlbury-Paddington
  • 1237 Charlbury-Reading

The 0943 does it in 1hr09, even despite four minutes at Oxford and six at Reading. No Hanborough calls.

The up journeys appear to run from Oxford to Moreton, then reverse there, all ECS.

All but the 1237 starting from Oxford or cancelled throughout this morning. Useless.....

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 08:41, 4th August 2025
 
Monday August 4

2E77 05:10 Oxford to Worcester Shrub Hill (06:15) : "cancelled due to late arrival of an inbound service (YI)", according to RTT.

05:23 Hereford to London Paddington due 08:24 will be started from Worcester Shrub Hill and diverted between Worcester Shrub Hill and Reading.
This is due to a shortage of train crew.
Additional Information
If you are at Hereford and are travelling to Reading or London Paddington, you are advised to join the 05:30 Transport for Wales service to Newport where you can connect to GWR trains towards Reading and London Paddington.
We have 2 minibuses running in place of this train between Hereford and Worcester Shrub Hill. These will depart from the front of the stations and will run later than the advertised train times. For more information activate a help point that can be found at platform level.
Last Updated:04/08/2025 04:44

06:43 Worcester Shrub Hill to London Paddington due 08:44 is being delayed between Evesham and Moreton-In-Marsh and is now expected to be 27 minutes late.
This is due to a points failure.
Last Updated:04/08/2025 07:36

07:00 Worcester Shrub Hill to Didcot Parkway due 08:46 will be started from Oxford.
This is due to a fault with the signalling system.
Last Updated:04/08/2025 07:52

07:13 Great Malvern to London Paddington due 09:52 will call additionally at Shipton, Ascott-Under-Wychwood, Finstock and Combe.
It has been delayed at Worcestershire Parkway Hl and is now 14 minutes late.
This is due to a fault with the signalling system.
Last Updated:04/08/2025 07:52

08:18 Worcester Shrub Hill to London Paddington due 10:25 is being delayed between Hanborough and Oxford and is now expected to be 11 minutes late.
This is due to a fault with the signalling system earlier today.
Last Updated:04/08/2025 09:33

09:43 Charlbury to London Paddington due 10:52 will be started from Oxford.
This is due to a shortage of train crew.
Last Updated:04/08/2025 08:01

08:56 Great Malvern to London Paddington due 11:27 will be started from Worcester Foregate Street.
This is due to a fault with the signalling system.
Last Updated:04/08/2025 08:33

10:37 Charlbury to London Paddington due 11:52 will be started from Oxford.
This is due to train crew being delayed.
Last Updated:04/08/2025 10:23

11:38 Charlbury to London Paddington due 12:54 has been cancelled.
This is due to a shortage of train crew.
Last Updated:04/08/2025 11:39

1W11 0553 London Paddington to Great Malvern : held Evesham (+20) and Shrub Hill, arrived Worcester Foregate Street +32 and was cancelled thereafter.

10:53 London Paddington to Worcester Shrub Hill due 13:01 will be delayed between Oxford and Hanborough.
This is due to a fault with the signalling system.
Last Updated:04/08/2025 08:06
RTT reports no delay between Oxford and Hanborough.

11:52 London Paddington to Hereford due 14:44 will no longer call at Hanborough, Charlbury, Kingham, Honeybourne, Pershore and Worcestershire Parkway Hl.
It is being delayed at London Paddington.
This is due to damage to the overhead electric wires.
Last Updated:04/08/2025 12:16
Departed Paddington +33. Arrived Shrub Hill +25 and cancelled thereafter.

15:18 Hereford to London Paddington due 18:29 will be started from Worcester Shrub Hill.
This is due to damage to the overhead electric wires.
Last Updated:04/08/2025 13:44



Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 17:11, 3rd August 2025
 
Sunday August 3
16:58 Great Malvern to London Paddington due 19:26 will be terminated at Reading.
This is due to a shortage of train crew.
Last Updated:03/08/2025 16:48

Re: North Cotswold line delays and cancellations - 2025
Posted by Richard Fairhurst at 12:38, 3rd August 2025
 
A bunch of extra trains in the timetable for Wilderness Festival returnees tomorrow:

  • 0943 Charlbury-Paddington
  • 1037 Charlbury-Paddington
  • 1138 Charlbury-Paddington
  • 1237 Charlbury-Reading

The 0943 does it in 1hr09, even despite four minutes at Oxford and six at Reading. No Hanborough calls.

The up journeys appear to run from Oxford to Moreton, then reverse there, all ECS.

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 22:17, 2nd August 2025
 
This evening's changes are:

RTT: 1P41 20:20 Hereford to London Paddington (23:38) : cancelled due to a signalling problem (IG).

JourneyCheck has:
20:20 Hereford to London Paddington due 23:38 will be terminated at Worcester Shrub Hill.
This is due to a fault with the signalling system.
Last Updated:02/08/2025 20:48

RTT: 1P39 20:03 Worcester Foregate Street to London Paddington : started from Foregate St (JourneyCheck still has Shrub Hill)

Reviewing RTT on Sunday morning, Ledbury had the signalling problems.
1W03 16:50 London Paddington to Hereford arrived Ledbury +11, but departed +139. It arrived Hereford +149 (at 22:12), so not surprising that the 20:20 return was cancelled.
All of West Midlands trains through Ledbury after 20:00 were cancelled.
WMT's 1M88 19:40 Hereford to Worcester Foregate Street departed Hereford at 22:22 (+162)
The stock of 1W03 ran empty back to Shrub Hill, departing Hereford at 22:45 and arriving Shrub Hill at 23:24.
Things seem to be back to normal this morning (Sunday).

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 16:03, 2nd August 2025
 
Saturday August 2

1W02 11:50 London Paddington to Hereford (14:26) : delayed before Didcot, Oxford +38, held Evesham (+55), arrived Great Malvern +64 and cancelled thereafter.
1W25 12:53 London Paddington to Worcester Foregate St : arrived Shrub Hill +28 and cancelled thereafter.

13:50 London Paddington to Great Malvern due 16:17 will be terminated at Oxford.
This is due to a shortage of train crew.
Last Updated:02/08/2025 13:29

An additional train service has been planned to operate as shown 16:03 Worcester Shrub Hill to Great Malvern due 16:17.
Last Updated:02/08/2025 13:29

Stock ran empty Oxford - Shrub Hill.

15:14 Hereford to London Paddington due 18:24 will be started from Great Malvern.
This is due to a problem currently under investigation.
Last Updated:02/08/2025 13:28

20:03 Worcester Foregate Street to London Paddington due 22:24 will be started from Worcester Shrub Hill.
This is due to a late running train being in front of this one.
Last Updated:02/08/2025 14:29

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 10:30, 1st August 2025
 
Something happened in the late evening south of Oxford.

1P44 19:45 Great Malvern to London Paddington (22:24) : departed +19, delayed near Kennington (22:22), arrived +40.
1W41 20:52 London Paddington to Great Malvern (23:13) : delayed near Kennington at 22:18, Oxford (+41), arrived +52.

And it looks as if the same issue has been affecting services today, Friday August 1:

Cancellations to services between Didcot Parkway and Oxford
Following a fault with the signalling system at Didcot Parkway the line towards Oxford has now reopened. Disruption is expected until 11:00 01/08.
Customer Advice
Following some signalling problems between Didcot Parkway and Oxford this morning, the fault has now been fixed and trains can run normally again. However a few initial delays and cancellations remain.
Last Updated:01/08/2025 10:16

07:50 London Paddington to Great Malvern due 10:14 will be terminated at Worcester Shrub Hill.
It has been previously delayed and is now 39 minutes late from Charlbury.
This is due to a fault with the signalling system.
Last Updated:01/08/2025 09:59

08:52 London Paddington to Great Malvern due 11:14 will be diverted between Reading and Worcester Shrub Hill.
It is being delayed at London Paddington.
This is due to a fault with the signalling system.
Last Updated:01/08/2025 09:22

10:59 Great Malvern to London Paddington due 13:25 will be started from Worcester Shrub Hill.
This is due to a fault with the signalling system.
Last Updated:01/08/2025 10:00

The disruption lasted rather longer than was hoped:

1W15 07:50 London Paddington to Great Malvern (10:14) : delayed Didcot - Oxford (+37), held Evesham (+57), arrived Worcester Shrub Hill +55 and cancelled thereafter.
1W17 08:52 London Paddington to Great Malvern (11:14) : diverted via Swindon and Stroud.
1W01 09:52 London Paddington to Hereford (12:46) : delayed before Oxford (+16), arrived +14.
1W21 10:53 London Paddington to Worcester Shrub Hill (13:01) : delayed before Oxford (+20), arrived +26.
1W02 11:52 London Paddington to Hereford (14:44) : departed +22, Oxford +37, held Evesham (+59), arrived Great Malvern +62 and cancelled thereafter.
1W25 12:52 London Paddington to Worcester Foregate Street (15:00) : Oxford +7, held Evesham (+15), arrived +17.

1P20 08:18 Worcester Shrub Hill to London Paddington (10:25) : held Didcot (+9), arrived +22.
1P22 08:56 Great Malvern to London Paddington (11:27) : delayed Oxford - Didcot (+25), arrived +23.
1P30 13:16 Worcester Shrub Hill to London Paddington (15:22) : departed +18, arrived +24.
1P05 15:18 Hereford to London Paddington () : started from Great Malvern.

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 16:40, 31st July 2025
 
Thursday July 31

Today is going well, except for
13:18 Hereford to London Paddington due 16:24
Toilet facilities are not available.
Last Updated:31/07/2025 12:19
It's a 5-car.

Re: North Cotswold line delays and cancellations - 2025
Posted by ChrisB at 10:28, 31st July 2025
 
Faulty track at Honeybourne I understand from National Rail

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 10:26, 31st July 2025
 
14:53 London Paddington to Worcester Foregate Street due 17:04 will be delayed at Moreton-In-Marsh.
This is due to a safety inspection on a train.

Last Updated:30/07/2025 14:06

1W29 14:53 London Paddington to Foregate St (17:04) was cancelled after Moreton (16:24). The stock ran in service to Evesham (depart 17:30, arrive 17:47).
1W31 15:52 London Paddington to Great Malvern (18:26) was diverted via Swindon and Stroud.
1W33 16:58 London Paddington to Great Malvern (19:25) was delayed Charlbury - Ascott and arrived +24.
1W03 17:34 London Paddington to Hereford (20:25) was delayed before Oxford (+17) and arrived +24.
1W34 17:57 London Paddington to Worcester Foregate Street (20:11) was delayed Charlbury - Ascott and arrived Shrub Hill +15, Foregate St +34.

1P39 17:26 Foregate St to London Paddington (19:52) was started from Evesham (+21) and arrived +26.
1P40 18:02 Worcester Foregate Street to London Paddington (20:29) was cancelled throughout.
1P44 19:45 Great Malvern to London Paddington (22:24) departed +24 and arrived +1.

Big gaps in the afternoon service between Oxzford and Worcester in both directions.



Re: North Cotswold line delays and cancellations - 2025
Posted by Witham Bobby at 14:27, 30th July 2025
 
Wednesday 30tt.  Not so good

12:52 London Paddington to Worcester Foregate Street due 15:00 will be terminated at Oxford.
It will no longer call at Hanborough, Charlbury, Kingham, Moreton-In-Marsh, Honeybourne, Evesham, Pershore, Worcestershire Parkway Hl, Worcester Shrub Hill and Worcester Foregate Street.
This is due to a safety inspection of the track.
Last Updated:30/07/2025 13:50

14:53 London Paddington to Worcester Foregate Street due 17:04 will be delayed at Moreton-In-Marsh.
This is due to a safety inspection on a train.

Last Updated:30/07/2025 14:06

15:18 Worcester Foregate Street to London Paddington due 17:29 will be started from Oxford.
It will no longer call at Worcester Foregate Street, Worcester Shrub Hill, Worcestershire Parkway Hl, Evesham, Moreton-In-Marsh, Kingham, Charlbury and Hanborough.
This is due to a safety inspection of the track.
Last Updated:30/07/2025 13:50


Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 06:50, 30th July 2025
 
Tuesday July 29

... was a good day

Re: North Cotswold line delays and cancellations - 2025
Posted by TonyN at 10:09, 28th July 2025
 
GWR services are now calling at Worcester Foregate Street

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 09:49, 28th July 2025
 
Monday July 28

Not a good start to the week:
Due to a shortage of station staff at Worcester Foregate Street the line is closed.
Train services running through this station have been cancelled. Disruption is expected until the end of the day.
Customer Advice
We have been informed that Worcester Foregate station is closed this morning to trains, due to staff sickness.
As a result GWR services will not call at the station. Customers are advised to use Worcester Shrub Hill to make their journeys instead.
Further Information
An update will follow within the next 2 hours.
Last Updated:28/07/2025 07:52

In consequence:
07:13 Great Malvern to London Paddington due 09:42 will be started from Worcester Shrub Hill.
This is due to a shortage of station staff.
Last Updated:28/07/2025 07:03

08:56 Great Malvern to London Paddington due 11:27 will no longer call at Worcester Foregate Street.
This is due to a shortage of station staff.
Last Updated:28/07/2025 07:49

09:56 Great Malvern to London Paddington due 12:23 will be started from Oxford.
This is due to train crew being delayed by service disruption.
Last Updated:28/07/2025 07:30

10:59 Great Malvern to London Paddington due 13:25 will no longer call at Worcester Foregate Street.
This is due to a shortage of station staff.
Last Updated:28/07/2025 08:03

06:52 London Paddington to Great Malvern due 09:29 will be terminated at Oxford.
This is due to train crew being delayed by service disruption.
Last Updated:28/07/2025 07:29

07:50 London Paddington to Great Malvern due 10:14 will no longer call at Worcester Foregate Street.
This is due to a shortage of station staff.
Last Updated:28/07/2025 08:02

Meanwhile
1P02 05:23 Hereford to London Paddington (08:24) waited at Foregate St for 38, arrived Paddington +35.

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 10:47, 27th July 2025
 
Saturday July 26

...was a good day.

Sunday July 27

19:58 Great Malvern to London Paddington due 22:23 will be terminated at Reading.
This is due to a shortage of train crew.
Last Updated:27/07/2025 04:49

Later (17:00):
14:28 Hereford to London Paddington due 17:22 will no longer call at Radley, Didcot Parkway and Reading.
It is being delayed at Evesham.
This is due to a safety inspection on this train.
Last Updated:27/07/2025 16:03
Departed Evesham +20.

Meanwhile 1W39 13:50 London Paddington to Great Malvern (16:16) departed +17 and arrived +22 (so wasn't actually delayed by the 14:28).

Later (21:50):
19:58 Great Malvern to London Paddington due 22:23 will be terminated at Oxford.
This is due to a shortage of train crew.
Last Updated:27/07/2025 21:11

Meanwhile, 1W08 1850 London Paddington to Hereford departed +23, was held at Wolvercote (+26) and at Evesham (+39), arrived +32.

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 06:13, 25th July 2025
 
Friday July 25

05:16 Worcester Shrub Hill to London Paddington due 07:24
This is due to more trains than usual needing repairs at the same time.
Will be formed of 5 coaches instead of 9.
Last Updated:25/07/2025 04:46

05:53 London Paddington to Great Malvern due 08:38 will be delayed at Oxford and is expected to be 30 minutes late.
This is due to train crew being delayed.
Last Updated:25/07/2025 04:04
Departed Oxford +18, held Wolvercote (+28), saved 12-minute stand at Evesham, arrived Shrub Hill +15, Foregate St +40 and cancelled thereafter.

08:56 Great Malvern to London Paddington due 11:27 will be started from Worcester Foregate Street.
This is due to train crew being delayed by service disruption.
Last Updated:25/07/2025 07:53

Re: North Cotswold line delays and cancellations - 2025
Posted by Worcester_Passenger at 13:07, 24th July 2025
 
Thursday July 24

1W01 09:52 London Paddington to Hereford (12:46) arrived Great Malvern +5 and was cancelled thereafter.

13:18 Hereford to London Paddington due 16:24 will be started from Great Malvern.
This is due to a points failure.
Last Updated:24/07/2025 11:57

12:52 London Paddington to Worcester Foregate Street due 15:00 will be starting late from London Paddington.
This is due to a fault on this train.
Last Updated:24/07/2025 12:50
Departed Paddington +4, held Reading (+16).

13:50 London Paddington to Great Malvern due 16:15 will be starting late from London Paddington.
This is due to a points failure.
Last Updated:24/07/2025 12:58

The 13:50 is formed of the stock from 1P26 1059 Great Malvern to London Paddington (13:25), which arrived +34. 13:50 has now departed +23.

Later (16:00):
13:50 London Paddington to Great Malvern due 16:15 has been previously delayed, has been further delayed at Reading and is now 43 minutes late.
This is due to a fault on a train in front of this one.
Last Updated:24/07/2025 15:49

...and it's probably going to terminate at Shrub Hill:
16:32 Great Malvern to London Paddington due 19:29 will be started from Worcester Shrub Hill.
This is due to a fault on a train in front of this one.
Last Updated:24/07/2025 15:49

Later (17:30):
1W27 13:50 London Paddington to Great Malvern (16:15) did indeed terminate at Worcester Shrub Hill +43.

And that has caused delays on the section between Evesham and Norton:
1W27 13:50 London Paddington to Great Malvern (16:15) Evesham-Norton 16:21-16:37
1P05 15:18 Hereford to London Paddington (18:29) : held Norton (+18) : N-E 16:39-16:54.
1W29 14:53 London Paddington to Worcester Foregate Street (17:04) : held Evesham (+17), E-N 16:55-17:09, arrived +16.
1P38 16:32 Great Malvern to London Paddington (19:29) : started from Shrub Hill, N-E 17:11-17:25.

Later (21:45):

not reported on JourneyCheck
1W36 1857 London Paddington to Great Malvern (21:18) : departed +14, arrived +17.

19:53 London Paddington to Hereford due 22:57 will be delayed at Oxford and is expected to be 10 minutes late.
This is due to train crew being delayed.
Last Updated:24/07/2025 20:13

20:52 London Paddington to Great Malvern due 23:13 has been delayed at London Paddington and is now 13 minutes late.
This is due to train crew being delayed.
Last Updated:24/07/2025 21:12

 
The Coffee Shop forum is provided by customers of Great Western Railway (formerly First Great Western). The views expressed are those of the individual posters concerned. Visit https://www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site at admin@railcustomer.info if you feel that the content provided by one of our posters contravenes our posting rules. Our full legal statment is at https://www.greatwesternrailway.info/legal.html

Although we are planning ahead, we don't know what the future will bring here in the Coffee Shop. We have domains "firstgreatwestern.info" for w-a-y back and also "greatwesternrailway.info"; we can also answer to "greatbritishrailways.info" too. For the future, information about Great Brisish Railways, by customers and for customers.
 
Current Running
GWR trains from JourneyCheck
 
 
Code Updated 11th January 2025